Energy

MASJED SOLEYMAN DAM AND POWER PLANT‎

PERIOD:‎1995 – 2010‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ This dam is on Karun river, it is a clay core rockfill dam, ‎and ۱۷۷ m high at base. It has ۵ radial spillway gates with ‎an inflow of ۲۳۰۰ m۳/s (PMF). The power plant consists of ‎four ۲۵۰-MW turbine generators.‎

LOCATION:‎ ‎۲۵.۵ km away from northeast of Masjed Soleyman town

STAGE:‎ Masjed Soleyman Dam was impounded in ۲۰۰۰, and power plant ‎units were connected to the national grid between ۲۰۰۲–۲۰۰۳, ‎minor and complementary work of the project lasted until ‎‎۲۰۱۰.‎

MOSHANIR’S ROLE:‎ Moshanir has performed all phases of engineering services ‎including reconnaissance, phases ۱, ۲ and ۳ based on a joint ‎venture agreement.‎

BAKHTIARI DAM AND POWER PLANT

PERIOD:‎ Commenced in June 2005‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ Double curvature concrete arch dam, height ۳۱۵ m from ‎foundation, foundation height ۱۰ m, crest length ۵۰۹ m, ‎foundation width ۵۰ m, crest width ۱۰ m, reservoir capacity ‎‎۴۸۴۵ million cubic meters, reservoir surface area ۵۸.۷ km۲, ‎reservoir length ۵۹ km.‎

LOCATION:‎ In lower part of Bakhtiari river in Lorestan Province and in ‎southwestern slopes of Zagros Mountains

STAGE:‎ Construction of diversion system and access ways

MOSHANIR’S ROLE:‎ Implementation of the second phase designs, engineering ‎services as well as supervision on construction work of dam ‎and power plants

SPECIAL ACHIEVEMENTS:‎ The world’s tallest double curvature concrete arch dam ۳۱۵ m ‎in height, the country’s second largest artificial reservoir ‎after Karkheh with a capacity of ۴.۸ billion cubic meters at ‎normal elevation, negligible damage caused by the reservoir ‎in terms of social issues, power plant capacity ۱۵۰۰ MW.‎

SIAHBISHE PUMPED STORAGE DAM AND POWER PLANT

PERIOD:‎ ‎2003 – 2014‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ Upper dam is a concrete-face rockfill dam which is ۸۲.۵ m ‎tall, ۲۱۵ m wide at its foundation. Its reservoir has an ‎active storage capacity of ۳.۶ million cubic meters, the ‎lower dam is also a concrete-face rockfill dam, ۱۰۲ m tall, ‎‎۳۸۲ m wide at its foundation, the reservoir has an active ‎storage capacity of ۳.۸ million cubic meters, the powerhouse ‎is an underground pumped storage type with four vertical ‎Francis turbines.‎

LOCATION:‎ Adjacent to Siahbishe village

STAGE:‎ Completion of dam construction operations, and commissioning ‎of powerhouse units

MOSHANIR’S ROLE:‎ Engineering services for tendering, supreme supervision, ‎management and control of design review, and site ‎supervision

SPECIAL ACHIEVEMENTS:‎ The country’s first pumped storage dam, hydroelectric power ‎generation capacity of ۱۰۴۰ MW at peak hours, consumption of ‎electrical power with a capacity of ۹۶۰ MW during low-load ‎hours

MASJED SOLEYMAN POWER PLANT DEVELOPMENT PROJECT‎

PERIOD:‎ ‎2009 – 2013‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ Underground power plant in continuation of the phase 1, ‎installation of four 250 MW turbines and generators

LOCATION:‎ ‎25.5 km away from north east of Masjed Soleyman city

STAGE:‎ Construction work finished in 2009, but some minor and ‎complementary work has continued until 2013. Power plant ‎units were connected to the national grid between 2007–2009‎

MOSHANIR’S ROLE:‎ Moshanir has performed all engineering services including ‎reconnaissance, phases 1, 2 and 3.‎

SPECIAL ACHIEVEMENTS:‎ By construction of this project, total production capacity ‎of Masjed Soleyman Dam and Power Plant has increased from ‎‎1000 MW to 2000 MW, and major part of production during low-‎load and intermediate-load hours has been transferred to the ‎peak load. Average annual power production is 3700 GW/h ‎which ranked first among the country’s hydro power plants.‎

SECOND POWER PLANT OF DEZ DAM

PERIOD:‎ ‎2007 – 2010‎

EMPLOYER:‎ Khuzestan Water and Power Authority

TECHNICAL SPECIFICATIONS:‎ Construction of an underground power plant at the right bank ‎of Dez Dam, and four ۱۸۰-MW turbine generators with a total ‎capacity of ۷۲۰ MW

LOCATION:‎ ‎۲۴ km away from northeast of Dezful and Andimeshk cities

STAGE:‎ Completion of phases ۱ and ۲ of engineering studies

MOSHANIR’S ROLE:‎ Moshanir has carried out engineering services based on a ‎joint venture agreement, and assisted the employer in ‎selecting the contractor and commencing the construction ‎work.‎

SPECIAL ACHIEVEMENTS:‎ The current power plant of Dez Dam has a capacity of ۵۲۰ MW ‎which will increase to ۷۲۰ MW after optimization. By ‎construction of the second power plant, the total capacity ‎will reach ۱۴۴۰ MW. By this project, a significant portion ‎of the energy generated during mid night will convert into ‎the base load.‎

SECOND POWER PLANT OF SHAHID ABBASPOUR DAM‎

PERIOD:‎ ‎1994 – 2010‎

EMPLOYER:‎ Khuzestan Water and Power Authority

TECHNICAL SPECIFICATIONS:‎ Total length of tunnels is 3300 m, total length of vertical ‎shafts is 600 m, total length of grouting and drainage ‎galleries is 1032 m, dimensions of powerhouse cavern are ‎‎145x26x49 m, total excavation volume is 460,000 m3, total ‎concrete volume is 200,000 m3, total reinforcement weight is ‎‎17,000 tons, total length of grout curtain is 30,000 m, ‎total length of drainage curtain is 10,000 m, four 250-MW ‎vertical Francis turbines.‎

LOCATION:‎ ‎55 km away from northeast of Masjed Soleyman, and 49 km away ‎from estuary of Karun river

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Designing and supervision on construction work of all parts ‎of powerhouse and auxiliary structures such as powerhouse, ‎T.O.Y., tunnel 7, headrace, intake, tailrace as well as ‎remaining work of 400 kV substation.‎

SARDASHT DAM AND POWER PLANT‎

PERIOD:‎ ‎2009 – 2013

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ A clay core rockfill dam with a ‎height of 114 m from river bed has been anticipated and its ‎reservoir capacity is about 380 million cubic meters. A ‎tunnel with a length of about 4.4 km was also designed to ‎supply the necessary water for the remote power plant of ‎Sardasht in south of dam in order to realize potential ‎production of 150 MW.‎

LOCATION:‎ Sardasht district

STAGE:‎ Provisional delivery of diversion tunnels and access road ‎was carried out.‎

MOSHANIR’S ROLE:‎ Moshanir as the consultant on the project is responsible for ‎providing all engineering services through a joint venture ‎agreement.‎

SPECIAL ACHIEVEMENTS:‎ ‎150 MW of hydroelectric power production, agricultural ‎water supply for 7,800 hectares of land surrounding the dam, ‎power grid frequency regulation and power production, short-‎term job creation during dam construction, and long-term job ‎creation by the agricultural land surrounding the dam

SECOND POWER PLANT OF MAROUN‎

PERIOD:‎ July 2004‎

EMPLOYER:‎ Khuzestan Water and Power Authority

TECHNICAL SPECIFICATIONS:‎ This power plant with a capacity of ۱۵۰ MW is an underground ‎power plant ۷۶ m long, ۲۱ m wide, and ۵۱ m high. The ‎powerhouse consists of two vertical Francis turbines and two ‎‎۷۵۰-MW vertical synchronous generators with mean annual ‎energy production of ۳۸۰ GW/h.‎

LOCATION:‎ ‎۱۹ km away from northeast of Behbahan

STAGE:‎ Construction, installation and commissioning

MOSHANIR’S ROLE:‎ Review, control, and approval of electromechanical ‎documents, supreme supervision, site supervision on ‎installation of equipment

 

POWER PLANT OF ZAYANDEHROUD REGULATING DAM‎

PERIOD:‎ Commenced in May 2011‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ An 8.5-MW power plant including two 4.25-MW units, the ‎contract is an EPC contract.‎

LOCATION:‎ ‎110 km away from west of Isfahan City

STAGE:‎ Selection of Contractor

MOSHANIR’S ROLE:‎ Supervision on project design and construction

 

CHITI DAM AND POWER PLANT OF LALI CITY‎

PERIOD:‎ ‎2012 – 2016‎

EMPLOYER:‎ Khuzestan Water and Power Authority

TECHNICAL SPECIFICATIONS:‎ Chiti dam has a catchment area of about ۸۶۴ square ‎kilometers. Mean annual inflow to the reservoir is ۶۸۵ ‎million cubic meters per year and the main purpose of this ‎dam is hydroelectric power generation. Dam body is made of ‎concrete, its height is ۱۳۵ m, and total volume of the ‎reservoir is ۶۰۰ million cubic meters.‎ The powerhouse consists of two units with an installed ‎capacity of ۷۲ MW and its mean annual energy production will ‎be ۱۸۴ GWh/year.‎

LOCATION:‎ Khuzestan province

STAGE:‎ Studies of phase II

MOSHANIR’S ROLE:‎ Performance of studies of phase II and preparation of tender ‎documents

STUDIES ON DEZ RUN-OF-THE-RIVER DAM AND POWER PLANT‎

PERIOD:‎ March 2008

EMPLOYER:‎ Khuzestan Water and Power Authority

TECHNICAL SPECIFICATIONS:‎ Optimized normal level ۱۸۳ m a.s.l., powerhouse installed ‎capacity ۱۲۰ MW, run of the river power plant with a base ‎load of ۴۹۰.۷ GWh per year, concrete dam height ۵۵ m, dam ‎crest elevation ۱۹۳ m.a.s.l., river bed elevation ‎‎۱۳۸ m.a.s.l., crest width ۷ m, crest length ۳۷۴ m, diversion ‎system is in the right bank including a horseshoe tunnel ‎with a diameter of ۱۲ m and a length of ۴۲۴ m.‎

LOCATION:‎ Dez river

STAGE:‎ Study phase

MOSHANIR’S ROLE:‎ Engineering services for the studies of phase I including ‎two phases of reconnaissance studies and one phase of ‎feasibility studies

SANGTUDEH (2) HYDROELECTRIC POWER PLANT‎

PERIOD:‎ ‎2006 – 2013‎

EMPLOYER:‎ Ministry of Energy and Industry of the Republic of ‎Tajikistan

TECHNICAL SPECIFICATIONS:‎ Earth-fill dam with clay core and run-of-the-river above-ground power plant, Crest length is ۳۸۵ m, height from river bed is ۳۱.۵ m, and total volume of reservoir is ۶۶.۵ million cubic meters. The powerhouse consists of two ۱۱۰-MW units. Design water head is ۱۹ m, design discharge head of units is ۵۱۶ m۳/s, and mean annual energy production is ۹۹۴ GWh.

LOCATION:‎ Southwest of Tajikistan, near Ghazal Gozar village (About ‎‎۱۸۰ km away from south of Dushanbe city)‎

STAGE:‎ End of construction work, at the stage of elimination of ‎powerhouse defects.‎

MOSHANIR’S ROLE:‎ In this project, Moshanir is responsible for preparation and ‎approval of project work breakdown structure as well as ‎control of progress reports and periodic statements of ‎Sangab Company.‎

 

NALUBAALE (OWEN FALLS) HYDROELECTRIC POWER STATION ‎DEVELOPMENT IN UGANDA‎

PERIOD:‎ ‎2002 – 2003‎

EMPLOYER:‎ Uganda Electricity Generation Company

TECHNICAL SPECIFICATIONS:‎ Power development of existing powerhouse to ۲ x ۴۰ MW‎

LOCATION:‎ Uganda

STAGE:‎ Delivered

MOSHANIR’S ROLE:‎ Review of mechanical, HSS, electrical and instrumentations ‎drawings, and site supervision on instrumentations, ‎coordination for I&C training.‎

UMA OYA DAM AND POWER PLANT

PERIOD:‎ Commenced in 2012

EMPLOYER:‎ The Ministry of Irrigation and Water Resources Management of the Democratic Socialist Republic of Sri Lanka

TECHNICAL SPECIFICATIONS:‎ Diversion of ۱۴۵ million cubic meters of water from Uma Oya basin to the Kirindi Oya basin, and irrigation of ۵۰۰۰ acres of farmland, and annual energy generation of ۲۵۰ GWh via ۲x۶۰ MW Power Plant units.

LOCATION:‎ Southeast of Sri Lanka, and ۲۰۰ km away from east of Uva Colombo province

STAGE:‎ Implementation of construction operations

MOSHANIR’S ROLE:‎ Moshanir as the consulting engineer of central laboratory of contractor, is active in three major sections including concrete and rock materials, soil and cement.

NEKA COMBINED-CYCLE POWER PLANT

PERIOD:‎ ‎2003 – 2007‎

EMPLOYER:‎ Thermal Power Plant Holding (TPPH)

TECHNICAL SPECIFICATIONS:‎ Construction of steam unit of Neka Combined Cycle Power ‎Plant, with a nominal capacity of 160 MW, secondary ‎combustion furnace (S.F.), recovery boiler, and once-through ‎seawater cooling system

LOCATION:‎ ‎25 KM away from Northeast of Neka City, Mazandaran Province

STAGE:‎ Commissioned and permanently delivered. At present TPPH is planning to extend Neka combined cycle power plant. The execution works will be started in the near future.

MOSHANIR’S ROLE:‎ Engineering services, design review, and site supreme ‎supervision.‎

SPECIAL ACHIEVEMENTS:‎ Design of recovery boilers with secondary combustion furnace ‎as well as use of seawater for cooling system with once-‎through condenser in compliance with environmental ‎considerations, construction of catchment basin 1100 m in ‎length and app. 200 m in width, construction of main and ‎auxiliary breakwater structures for two steam generators of ‎combined cycle power plant, the second steam unit will be considered in the Neka development program.‎

ABADAN COMBINED-CYCLE POWER PLANT

PERIOD:‎ ‎2007 – 2016

EMPLOYER:‎ Thermal Power Plant Holding (TPPH)

TECHICAL SPECIFICATIONS:‎ This power plant consists of 4 gas units and 2 steam units ‎with a total capacity of 820 MW, running on natural gas as ‎primary fuel and gas oil as backup fuel. The cooling system ‎is of ACC type.‎

LOCATION:‎ Kilometer 9 of Abadan – Mahshahr road

STAGE:‎ Commissioned and permanently delivered

MOSHANIR’S ROLE:‎ Engineering services and supreme supervision including ‎design review and compatibility, supervision on ‎manufacturing of local equipment, project management and ‎control, and site supervision.‎

SPECIAL ACHIEMENTS:‎ On the one hand, increased production capacity of network ‎and on the other hand increased local manufacturing ‎potentials for powerhouse equipment.

DAMAVAND COMBINED-CYCLE POWER PLANT

PERIOD:‎ ‎2006 – 2015

EMPLOYER:‎Thermal Power Plants Holding Company

TECHNICAL SPECIFICATIONS:‎ This power plant consists of 12 gas units and 6 steam units, ‎with a total capacity of 2880 MW, running on natural gas as ‎primary fuel and gas oil as the backup fuel. The cooling ‎systems used for steam units of this project are of Heller ‎type.‎

LOCATION:‎ Kilometer 40 of Tehran-Garmsar road

STAGE: ‎The units are installed and permanently delivered.

MOSHANIR’S ROLE:‎ Engineering services and supreme supervision including ‎design review and investigation of project progress ‎according to the time schedule, supervision on locally-‎manufactured equipment, project management and control and site ‎supervision

SPECIAL ACHIEVEMENTS:‎ Optimized use of the energy resulted from fuel consumption, ‎and increase of power plant productivity and efficiency ‎using domestic technical expertise in the field of design, ‎engineering, and increase of local manufacturing capacity of ‎power plant main equipment.‎

KHORRAM ABAD‎ COMBINED-CYCLE POWER PLANT

PERIOD:‎ 2018 – 2022

EMPLOYER:‎ Movaled Nirooye Khorramabad Company

TECHNICAL SPECIFICATIONS:‎ KhorramAbad Combined Cycle Project is under construction in one block consisting of two gas units each of 162 MW and one steam unit of 160MW , totally 484 MW of class E type. The cooling system is of ACC type and the boilers are of two-pressure with supplementary firing.

LOCATION:‎ Kilometer 10 of Andimeshk ring road

STAGE:‎ The first gas unit was synchronized in 16/APR/2019 at 17:05 ‎

MOSHANIR’S ROLE:‎ Engineering services and supreme supervision including ‎design review and investigation of project progress ‎according to the time schedule, supervision on locally-‎manufactured equipment, project management and control and site ‎supervision.

SPECIAL ACHIEVEMENTS:‎ Supporting Lorestan Regional Power Company, energy supply ‎for infrastructure and developing industries of the region, ‎creation of job opportunities for the region.

WESTERN KARUN POWER PLANT

PERIOD:‎ 2013 – 2014

EMPLOYER:‎ Petroleum Engineering and Development Company

TECHNICAL SPECIFICATIONS:‎ This project consists of one combined-cycle block including ‎two gas units and one steam unit with a nominal capacity of ‎about 500 MW. The auxiliary projects include gas and water ‎supply to the power plant, and construction of 230 KV ‎transmission lines and substation.‎

LOCATION:‎ ‎35 Kilometer away from Southwest of Ahvaz

STAGE:‎ Basic design for gas pipeline, gas pressure regulating stations, water transmission line and water treatment plant auxiliary projects finished and also, supreme supervision, engineering supervision and site supervision for substations and power transmission lines are in progress.

MOSHANIR’S ROLE:‎‎ For construction of power plant based on a BOO contract, the ‎major duties of the engineer include supervision on ‎engineering and construction of Western Karun Power Plant.‎ In construction of auxiliary projects, Moshanir is in charge ‎of preliminary studies, basic design, ‎preparation of scope of work and tender documents, ‎cooperation with the employer in tendering and determination ‎of winning tenders, site and supreme supervision.‎‎

CHADORMALU COMBINED-CYCLE POWER PLANT

PERIOD:‎ ‎2012 - 2016‎

EMPLOYER:‎ Chadormalu Mining and Industrial Company

TECHNICAL SPECIFICATIONS:‎ Two gas turbine generators of Map2+ each with a capacity of ‎‎166 MW, a steam turbine unit with a capacity of 160 MW, heat ‎recovery boiler with additional furnace, ACC cooling system.‎

LOCATION:‎ Kilometer 35 of Ardakan-Nain road

STAGE:‎Commissioned and permanently delivered

MOSHANIR’S ROLE:‎ Engineering services and supreme supervision including ‎design review and investigation of project progress ‎according to the time schedule, supervision on locally-‎manufactured equipment, project management and control and site ‎supervision

SPECIAL ACHIEVEMENTS:‎ Power supply to palletizing and steel recycling plants of ‎Chadormalu Mining and Industrial Company

IRANSHAHR GAS POWER PLANT‎

PERIOD:‎ ‎2010 – 2016

EMPLOYER:‎ Thermal Power Plants Holding Company

TECHNICAL SPECIFICATIONS:‎ The power plant consists of two gas units with a total ‎capacity of 324 MW, running on natural gas as the primary ‎fuel and gas oil as the backup fuel. Turbine type is V94-‎‎2/Type 5.‎

LOCATION:‎ Kilometer 17 of Iranshahr-Bam road

STAGE:Commissioned and permanently delivered.

MOSHANIR’S ROLE:‎ Engineering services and supreme supervision including ‎design review and investigation of project progress ‎according to the time schedule, supervision on locally-‎manufactured equipment, project management and control, site ‎supervision

SPECIAL ACHIEVEMENTS:‎ Increase in electrical energy production of power plants and ‎strengthening of power national grid

THERMAL POWER PLANT OF ESFAHAN STEEL COMPANY‎

PERIOD:‎ ‎2003 - 2015

EMPLOYER:‎ Esfahan Steel Company

TECHNICAL SPECIFICATIONS:‎ A steam/thermal power plant including two 55 MW units ‎running on coke gas, blast furnace gas, and natural gas

LOCATION:‎ Esfahan city

STAGE: Commissioned and permanently delivered

MOSHANIR’S ROLE:‎ Engineering services and supreme supervision including ‎design review and investigation of project progress ‎according to the time schedule, supervision on locally-‎manufactured equipment, project management and control and site ‎supervision

SPECIAL ACHIEVEMENTS:‎ Supervision on commissioning of equipment, as well as in ‎engineering phase such as preliminary studies, preparation ‎of detailed designs for power network analysis and load ‎estimation, calculations of short circuit, lighting system, ‎telecommunication system and fire alarm system, earthing ‎‎(grounding) system and lightning protection system, ‎auxiliary steam and auxiliary cooling systems, equipment ‎foundation, and preparation of tender documents for civil ‎work, and installation and commissioning of the project

SHAHID MOHAMMAD MONTAZERI POWER PLANT CONCRETE TANKS

PERIOD:‎ ‎2007 – 2015

EMPLOYER:‎ Iran Power Development Company

TECHNICAL SPECIFICATIONS:‎ Residual fuel oil underground concrete tank with a capacity ‎of 90,000 m3 for emergencies and for fuel transfer to two ‎powerhouse units or to tanks of power plant, if necessary

LOCATION:‎ Shahid Mohammad Montazeri Power Plant, ESFAHAN

STAGE:‎ The project has been permanently delivered.

MOSHANIR’S ROLE:‎ Engineering services and supreme supervision including ‎design review and investigation of project progress ‎according to the time schedule, supervision on locally-‎manufactured equipment, project management and control and site ‎supervision

SPECIAL ACHIEVEMENTS:‎ Given the distinctive characteristic of the project as an ‎embedded strategic tank, and to prevent fuel leakage into ‎surrounding area, some methods such as use of geo-membrane ‎below the foundation and outer side of tank concrete wall as ‎well as use of water sealing materials in form of plaster ‎and repair mortar on inner and outer sides of the tank wall ‎have been used.‎

JAHROM GAS TURBINE POWER PLANT

PERIOD:‎ 2005-2016

EMPLOYER:‎ Iran Power Development Company

TECHNICAL SPECIFICATIONS:‎ This project consists of 6 V94-2 gas units, each unit with a capacity of 162 MW, 130 kV Substation, running on natural gas as primary fuel and gas oil as backup fuel. The power plant is 1052 m above sea level.

LOCATION:‎ Kilometer 25 of Jahrom – Shiraz road

STAGE:‎ At the stage of reviewing of final invoice by the client‎

MOSHANIR’S ROLE:‎ In this project, in addition to the Engineering services of whole power plant, Moshanir Company had the role in procurement preparing of BOP2 equipment contains petroleum tanks & connections.

SPECIAL ACHIEVEMENTS:‎ Jahrom power plant project according to the EPC contacting activities for Moshanir Company.

Dibis Gas Power Plant in Iraq

PERIOD:‎ 2019-2021

EMPLOYER:‎ Sunir

TECHNICAL SPECIFICATIONS:‎ The power plant consists of two (2) gas units of V94-2 type

LOCATION:‎ In Iraq, Kirkuk Province near Dibis City

STAGE: Two turbine – generator units are installed on foundation. Erection of fuel tanks and auxiliary mechanical & electrical works is started and it is expected that the first unit is connected to the Grid before the next summer.

MOSHANIR’S ROLE:‎ Moshanir has the task of overall supervision and prevision an installation in this project.

SPECIAL ACHIEVEMENTS: Successful guidance of the project can have important results for Moshanir related to the performance of engineering services in abroad which can have positive effect on obtaining projects from abroad.

KERMAN COMBINED-CYCLE POWER PLANT

PERIOD:‎ 2004-2018

EMPLOYER:‎ Thermal Power Plant Holding (TPPH)

TECHNICAL SPECIFICATIONS:‎ This power plant is consist of 8 gas units and 4 steam units with total capacity of 1912 MW, running on natural gas as primary fuel and gas oil as backup fuel. The cooling system is of ACC type.

LOCATION:‎ Kilometer 3 of Yaghin - Rafsanjan road

STAGE: Commissioned and permanently delivered

MOSHANIR’S ROLE:‎ Engineering services and supreme supervision including design review and compatibility, supervision on manufacturing of local equipment, project management and control, and site supervision.

SHARIATI COMBINED-CYCLE POWER PLANT

PERIOD:‎ 2011-2016

EMPLOYER:‎ Thermal Power Plants Holding Company

TECHNICAL SPECIFICATIONS:‎ Construction of two fuel oil tanks each with a capacity of 15000 cubic meters.

LOCATION:‎ Mashhad city

STAGE: Commissioned and permanently delivered.

MOSHANIR’S ROLE:‎ Providing of engineering services to detailed design, supreme and site supervision on construction of two gas oil tanks each with a capacity of 15000 cubic meters.

SPECIAL ACHIEMENTS:: With respect to shortage of liquid fuel in Shariati combined-cycle power plant, adding gas oil tanks with the capacity of 30000 cubic meters led to ensure continuous improvement in operation of gas units during gas fuel shut down in power plant.

Shirvan Combined Cycle Project

PERIOD:‎ 2009-2020

EMPLOYER:‎ Thermal Power Plant Holding (TPPH)

TECHNICAL SPECIFICATIONS:‎ The existing power plant has six (6) gas units of V94-2 type each with the capacity of 159MW. The purpose of the project is the installation of three (3) steam units of 160 MW each and conversion of the gas units to the combined cycle blocks.

LOCATION:‎ The power plant is located in 12th km of south-east of Shirvan city.

STAGE: The first steam unit was synchronized in 28/09/2017 and was taken over provisionally to the operator in 30/04/2018. Also the second steam unit was synchronized in 21/07/2019 and was taken over provisionally in 31/10/2019. The third steam unit in under construction.

MOSHANIR’S ROLE:‎ This Project is one of the 22 steam units project which Moshanir Company has the responsibility of engineering services and overall supervision including design review and supervision on local manufacturing, management and project control and site supervision.

SPECIAL ACHIEMENTS:: Using technical knowledge of local experts in the fields of engineering and manufacturing of main equipment in the local factories.

BINALOOD WIND FARM‎

PERIOD:‎ ‎2002 - 2008‎

TECHNICAL SPECIFICATIONS:‎ This power plant includes ۴۳ turbines, each with a capacity ‎of ۶۶۰ kV. This wind farm site has a substation building ‎with an area of ۶۲۰ m۲ and access ways to turbines.‎

LOCATION:‎ ‎۵۵km away from Mashad-Nishabour road

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Anemometry studies of the region and wind farm simulation, ‎wind farm layout and layout design of wind turbines, ‎estimation of recoverable energy, and economic analysis of ‎the project, preliminary studies, access roads design, ‎foundation, substation building and culvert, supervision on ‎geological tests, preparation of general layout drawings, ‎structure, bridge and culverts, local ۲۰ kV network design, ‎‎۲۰ kV substations, ۱۳۲/۲۰ kV substation building, ‎supervision on construction, manufacturing, installation and ‎provisional and permanent delivery of wind turbines, and ‎training.‎

ARMENIA WIND FARM‎

PERIOD:‎ October 2004 – September 2005‎

EMPLOYER:‎ SUNIR Company

TECHNICAL SPECIFICATIONS:‎ The wind farm consists of four ۶۶۰ KW wind turbines along ‎with transformer, access roads, and electrical operation ‎area outside the turbines.‎

LOCATION:‎ Along the ridge of Pushkin Pass located in Northern Vanadzor ‎City, Armenia

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Monitoring the anemometry operations at Puskin Pass, ‎preparation of technical and economic feasibility studies on ‎construction of power plant, supervision on anemometry ‎operations in Sisian, design of foundations and access ‎roads, supervision on construction, manufacture, ‎installation, commissioning and provisional delivery of wind ‎turbines

MANJIL WIND FARM‎

PERIOD:‎ Commenced in December 2005‎

EMPLOYER:‎ Renewable Energy Organization of Iran

TECHNICAL SPECIFICATIONS:‎ This project consists of a hundred and twenty three ۶۶۰KW ‎wind turbines‎

LOCATION:‎ Manjil area‎

STAGE:‎In progress

MOSHANIR’S ROLE:‎ Wind farm layout in Harzevil and Siahbishe sites, estimation ‎of recoverable energy, studies on local ۲۰ kV network ‎design, preliminary studies and access road design, ‎culverts, foundations of turbines and transformer, security ‎buildings, supervision on geological tests, preparation of ‎general layout of steel structures, bridges and culverts, ‎supervision on construction and electrical work outside the ‎turbine, manufacture, installation, commissioning and ‎provisional delivery of wind turbines.‎

INSTALLATION OF 15 WIND MEASUREMENT MASTS ACROSS THE COUNTRY

PERIOD:‎ Late September 2011‎

EMPLOYER:‎ Iranian Atrin Wind Power Plants Company

TECHNICAL SPECIFICATIONS:‎ The mast with a height of 100 m and 8 sensors to provide ‎wind data

LOCATION:‎ Khaf district

STAGE:‎ In progress

MOSHANIR’S ROLE:‎ Engineering services for foundation design, supervision on ‎construction of foundation, and electrical operations ‎outside the 2.5 MW turbine, turbine maintenance and ‎commissioning.‎

 

ONE UNIT OF 2.5 MW WIND TURBINE IN KHAF

PERIOD:‎ Commenced in October 2012

EMPLOYER:‎ Iranian Atrin Wind Power Plants Company

TECHNICAL SPECIFICATIONS:‎ Installation of one unit of ۲.۵ MW wind turbine

LOCATION:‎ Khaf district

STAGE:‎ In progress

MOSHANIR’S ROLE:‎ Foundation design and supervision on foundation construction, electrical work outside the ‎turbine and maintenance and operation of wind turbine‎

MESHKIN SHAHR GEOTHERMAL POWER PLANT‎

PERIOD:‎ ‎2007 – 2015‎

EMPLOYER:‎ Renewable Energy Organization of Iran

TECHNICAL SPECIFICATIONS:‎ ‎۲۵ MW Geothermal Power Plant

LOCATION:‎ Northern slopes of Mount Sabalan

STAGE:‎ Drilling of ۱۱ wells and construction of a ۵ MW Pilot Power ‎Plant

MOSHANIR’S ROLE:‎ Designing and supervision on construction of access road to ‎drilling site, construction of ۵ drilling sites, ‎construction of ۵۰۰۰ m۳ water storage tank, two pumping ‎stations, indoor warehouse, drilling of ۱۱ geothermal wells, ‎performance of geo-physical tests and studies, geothermal ‎well flow testing, construction of Alvenius pipe line, and ‎well logging.‎

SPECIAL ACHIEVEMENTS:‎ This power plant is the first geothermal power plant in Iran ‎which aims to use renewable energy as an alternative source ‎of power supply.‎

YAZD SOLAR POWER PLANT‎

PERIOD:‎ ‎2006 - 2016

EMPLOYER:‎ Iran Power Development Company

TECHNICAL SPECIFICATIONS:‎ The power plant with a total capacity of 478 MW comprises ‎two gas units each with a capacity of 159 MW under ISO ‎conditions, and a steam unit of 160 MW. A solar farm with a ‎‎17-MW share of solar energy has been considered. The ‎cooling system used in this project for steam unit is of ‎Heller type.‎

LOCATION:‎ Suburb of Yazd district

STAGE:‎ The gas units and combined cycle steam units are completed. The units are connected to national grid and are temporarily delivered. The basic and detail design for solar farm is finished and site leveling and construction work of solar farm will be reactivated in near future.

MOSHANIR’S ROLE:‎ Employer’s Engineer, and supervision on site operations

SPECIAL ACHIEVEMENTS:‎ Integrated solar design for the first time in Iran

POTENTIAL SURVEY AND PREPARATION OF WIND ATLAS OF IRAN‎

PERIOD:‎ ‎2004 - 2005‎

EMPLOYER:‎ Renewable Energy Organization of Iran

TECHNICAL SPECIFICATIONS:‎ Preparation of Atlas and wind map of Iran in order to ‎identify wind prone areas of the country and to determine ‎their potential for wind power plants

LOCATION:‎ -

STAGE:‎ Completed

MOSHANIR’S ROLE:‎ In this project, Moshanir was responsible for collection and ‎analysis of the considered information, preparation of zero ‎wind map, preparation of tender documents for purchase of ‎‎۵۰ anemometric stations, supervision on installation and ‎commissioning of stations, analysis of data taken from the ‎stations, implementation of atmospheric model (KLIMM) ‎through dividing of country’s zone into more than ‎‎۵۰۰ regions, calibration of the wind map, preparation of ‎final version of Atlas and wind map of Iran for three ‎elevations of ۴۰, ۶۰ and ۸۰ m above the ground level, ‎identification of ۱۰ proper sites for wind power plants, ‎preparation of Iran wind map software with the ability to ‎update.‎

CONSTRUCTION OF WIND TURBINE MANUFACTURING PLANTS

PERIOD:‎ ‎2011 – 2012‎

EMPLOYER:‎ Atrin Gostaresh Wind Turbines Company

TECHNICAL SPECIFICATIONS:‎ Wind turbine manufacturing plant with an annual production ‎of ۲۵۰ units per year will in the early phases carry out ‎construction of blades, tower and assembly of turbine ‎nacelles of ۱.۵ to ۳ MW.‎

LOCATION:‎ -

STAGE:‎ Preliminary studies

MOSHANIR’S ROLE:‎ Preparation of feasibility plan and business plan for ‎construction of megawatt-scale wind turbine manufacturing ‎plants to present to the bank

 

‎2,000 MEGAWATTS OF WIND POWER PLANT

PERIOD:‎ ‎2010 - 2012‎

EMPLOYER:‎ Atrin Gostaresh Wind Turbines Company

TECHNICAL SPECIFICATIONS:‎ Construction of ۵۰۰-MW scale wind power plants using ۱.۵ to ‎‎۲.۵ MW turbines was targeted.‎

LOCATION:‎ Sistan and Baluchestan, Razavi Khorasan and Semnan provinces

STAGE:‎ Completed

MOSHANIR’S ROLE:‎ Identification of wind prone areas for construction of wind ‎power plants, and performance of technical and economic ‎feasibility studies according to the requirements of ‎Renewable Energy Organization of Iran, and performance of ‎electrical studies and obtaining the approval for grid ‎connection design

 

EXPANSION TURBINE OF SHAHID MOHAMMAD MONTAZERI THERMAL POWER ‎PLANT OF ESFAHAN

PERIOD:‎ ‎2007-2015

EMPLOYER:‎ Iran Power Development Company

Technical specifications:‎ ‎2×8 MW axial flow six-stage expansion turbines, 2×6.3 kV ‎synchronous generators

LOCATION:‎ Shahid Mohammad Montazeri Thermal Power Plant of Esfahan

Phase: Synchronization of the units have been done, but the commissioning and functional tests and also defects removal have not been completed yet because of fuel gas shortage in the Power Plant.

MOSHANIR’S ROLE:‎ Moshanir as the project consulting engineer provided ‎engineering services for design review, supreme and site ‎supervision on installation and commissioning work

SPECIAL ACHIEVEMENTS:‎ Production of clean energy from gas pressure reducing ‎stations of the power plant

SEMNAN COMBINED-CYCLE POWER PLANT

PERIOD:‎ March – February 2013‎

EMPLOYER:‎ Semnan Regional Power Company

TECHNICAL SPECIFICATIONS:‎ Currently, it comprises of two V94-2 gas units, each with a ‎nominal capacity of 162 MW under ISO conditions, with an ‎efficiency of 33.8%. Meanwhile, turbine hall of this power ‎plant is predicted for future extension of power plant ‎turbine hall has been predicted for installation of two ‎other gas units. The power plant runs on gas and gas oil.‎

LOCATION: Near Semnan City‎

STAGE:‎ Completed

MOSHANIR’S ROLE:‎ Engineering and technical services including identification ‎of defects after installation and provision of solutions to ‎remove them, supervision on taking over from the ‎construction contractor and delivering to the operation ‎contractor of the power plant, O&M repairs of power plant as ‎well as supervision on operation.‎

SHAHID BEHESHTI POWER PLANT OF LOSHAN

PERIOD:‎ ‎2010 – 2013‎

EMPLOYER:‎ Guilan Regional Power Company

TECHNICAL SPECIFICATIONS:‎ Supervision on design, installation, and commissioning of ‎management system of furnaces and installation of triple-‎furnace boiler of unit 2‎

LOCATION:‎ Manjil City

STAGE:‎ In progress

MOSHANIR’S ROLE:‎ Review of all documents and design drawings of BMS system, ‎optimization of initial design of the project, review of ‎documents related to transformation into triple-furnaces, ‎supervision on purchase, preparation of technical reports, ‎supervision on construction, installation and operation.‎

SPECIAL ACHIEVEMENTS:‎ Increased boiler efficiency, easier operation, increased ‎boiler safety, use of triple furnaces, proper distribution ‎of flames and increasing the life of boiler tubes, control ‎of environmental parameters through furnace management ‎system and conservation of fuel consumption, prevention of ‎any type of gas leakage.‎

 

SHAHROOD COMBINED-CYCLE POWER PLANT‎

PERIOD:‎ ‎2012 – 2014‎

EMPLOYER:‎ Semnan Regional Power Company

TECHNICAL SPECIFICATIONS:‎ Currently, this power plant has two gas units of Siemens V94-‎‎2, each with a nominal capacity of 162 MW under ISO ‎conditions, with an efficiency of 33.8%. The said units run ‎on gas and gas oil.‎

LOCATION:‎ Near Shahrood City

STAGE:‎ In progress

MOSHANIR’S ROLE:‎ Identification of defects after installation, and provision of ‎solutions to remove them, and supervision on taking over from ‎construction contractor and delivering to the operation ‎contractor, supervision on O&M repairs of power plant as well ‎as on operation

 

RAMIN POWER PLANT OF AHVAZ‎

PERIOD:‎ ‎2012 – 2015‎

EMPLOYER:‎ Khuzestan Regional Power Company

TECHNICAL SPECIFICATIONS:‎ Engineering services, and supervision on overhaul, mid-term ‎and ongoing maintenance, and supervision on operation of ‎units 1 to 6 of Ramin Power Plant‎

LOCATION:‎ 25 km of Ahvaz-Masjed Soleyman road

STAGE:‎ In progress

MOSHANIR’S ROLE:‎ Review of analysis report of units tripping, determination of ‎the contribution of each equipment in general tripping of ‎systems, studies to eliminate defects, establishment of power ‎quality indices, environmental issues, safety, painting, ‎coating and chemicals, industrial effluents reviews.‎

BANDAR ABBAS THERMAL POWER PLANT‎

PERIOD:‎ ‎2012 - 2013‎

EMPLOYER:‎ Hormozgan Regional Power Company

TECHNICAL SPECIFICATIONS:‎ Performance of consulting services, and supervision on ‎operation of 4 steam units and 2 gas units

LOCATION:‎ ‎25 km away from West of Bandar Abbas

STAGE:‎ In progress

MOSHANIR’S ROLE:‎ Development of project control system for suppliers, ‎preparation of CPM for general trend of repairs, preparation ‎of technical documents, supervision on implementation of ‎maintenance and operation manual, technical protection, safety ‎and health, performance of periodic reviews and conformity of ‎construction work to technical specifications, drawings and ‎standards.‎

KISH ISLAND HEAT RECOVERY BOILER

PERIOD:‎ ‎2001-2004‎

EMPLOYER:‎ Deputy for Electricity and Energy Affairs of Ministry of ‎Energy

TECHNICAL SPECIFICATIONS:‎ Heat recovery boiler with a nominal capacity of 90 ton/hr is ‎used for steam generation (10 bar pressure, 190°C ‎temperature). The necessary steam for water desalination plant ‎which is one of the fresh water resources in the island will ‎be produced by the heat loss from gas turbines.‎

LOCATION:‎ Kish Island

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Design review and site supervision

SPECIAL ACHIEVEMENTS:‎ Reduction of fuel consumption, use of dissipated energy, ‎abatement of environmental pollution

ARMENIA NATURAL GAS PIPELINE

PERIOD: 2005 – 2009

EMPLOYER: SUNIR Company

TECHNICAL SPECIFICATIONS: The Iran-Armenia gas pipeline is ۲۸ inches in diameter and about ۴۰ km long from zero point border to Kajaran city, the initial capacity of pipeline is about ۴ million cubic meters of natural gas per day. In this project, in addition to the main pipeline, launcher and receiver stations, methanol injection, condensate collection and cathodic protection system will be constructed along the pipeline.

LOCATION: In continuation of Iran-Armenia gas pipeline, this project starts from Norduz border region adjacent to Aras River and continues along the route from Meghri to Kajaran cities.

STAGE: Permanently delivered

MOSHANIR’S ROLE: Moshanir as the consultant on the project has responsibility for preparing tender documents, technical specifications of equipment, translating construction drawings from Russian into Persian, design review, evaluating and introducing contractors, supervision on the equipment supply, supreme and site supervision on project construction operations.

Transmission

PARSABAD, TAGHI DIZAJ, AZERBAIJAN BORDER 400 KV TRANSMISSION ‎LINE‎

PERIOD:‎ ‎2003 – 2007‎

EMPLOYER:‎ Iran Power Development Company

TECHNICAL SPECIFICATIONS:‎ Line length is more than 146 km. The tower is a concrete ‎telescopic lattice tower, and the line is 400 kV single ‎circuit double-bundle conductor transmission line. This ‎line consists of 49 towers. The optical fiber used in this ‎project has 24 cores with a diameter of 10.5 µm, 120 kV and ‎‎210 kV insulators have been used in this project.‎

LOCATION:‎ Ardabil province

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Engineering services and provision of project phase 2 ‎report, as well as supreme and site supervision on all ‎stages of foundation construction, equipment purchase, ‎complete installation and commissioning of the line.‎

SPECIAL ACHIEVEMENTS:‎ Due to agricultural land along the route especially in ‎Parsabad region with a length of about 20 km, concrete ‎telescopic towers were used, since these towers occupy less ‎space, the legal problems have been minimized.‎

SHAHID ABBASPOUR – KARUN III 400 kV TRANSMISSION LINE

PERIOD:‎ ‎1997 – 2001‎

EMPLOYER:‎ Esfahan Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ DT-60, DT-30, DT-15, DS tower, curlew conductor, OPGW 7-core ‎cable, 160 kN insulator, submerged foundation; line is 60 km ‎long.‎

LOCATION:‎ Khuzestan province

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Engineering services for phases 2, 3a and b‎

TEHRAN 230 kV CABLE PROJECT‎

PERIOD:‎ ‎2008 – 2011‎

EMPLOYER:‎ Tehran Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ A concrete canal was constructed under Tehran streets in ‎order to install Tehran 230 kV underground cable. The ‎canal’s inner width, inner height and length are 1.5 m, ‎‎2.5 m and 25 km, respectively. The canal’s depth is 4.4 m ‎below asphalt surface along the cable route. This canal was ‎designed in the form of 20 x 70 prefabricated concrete ‎segments. Installation of two circuits of 230 kV oil-filled ‎underground cable, four circuits of 63 kV XPLE cable with ‎telecommunication and control cables are anticipated. ‎Specifications of 230 kV cable are: copper conductor, ‎corrugated aluminum sheet, 1600 m2, 1250 A.‎

LOCATION:‎ Tehran

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Engineering services such as design, selection of ‎contractor, supervision on equipment supply, and ‎construction work.‎

SPECIAL ACHIEVEMENTS:‎ These projects are principally performed as infrastructure ‎projects in areas where overhead transmission line is not ‎possible in anyway to provide a point load or to strengthen ‎power grid within cities.‎

HORMUZ ISLAND 20 kV SUBMARINE CABLE‎

PERIOD:‎ ‎2008 – 2011‎

EMPLOYER:‎ Hormozgan Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ Among the features of this project is the integrated cable ‎used in two 9-m circuits each consisting of three 120-mm ‎cables and two pairs of telecommunication cables, the most ‎important part of the cable with outer diameter of 96 mm and ‎a length of about 9 km is waiting for special measures for ‎transportation, loading, unloading and implementation.‎

LOCATION:‎ Hormuz Island and Hormozgan province

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ All stages of design, supervision on construction and tests

SPECIAL ACHIEVEMENTS:‎ This project aims to connect Hormuz island grid network ‎located in Southern Iran to the national ‎grid. After investigations and necessary studies, and given ‎the load growth rate of Hormuz Island, construction of two ‎submarine cable circuits in the closest points to the island ‎and land was taken into consideration.‎

ZIARAN-KAN 400 kV DOUBLE-VOLTAGE FOUR-CIRCUIT TRANSMISSION ‎LINE‎

PERIOD:‎ ‎1997 – 2000‎

EMPLOYER:‎ Tehran Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ This line consists of towers with a weight of 116 ton/km, ‎and height of 65 m, 26 cores of conductors and shield ‎‎(ground) wires on the tower, and foundations with a volume ‎of 43 m3/tower and 128 m3/km, and it is a unique line with ‎respect to its specific construction conditions.‎

LOCATION:‎ Tehran province

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ All stages of design, preparation of necessary technical ‎specifications, and supervision on construction and tests

SPECIAL ACHIEVEMENTS:‎ Use of multi-circuit lines will provide optimum utilization ‎of bandwidth allocated to the considered overhead line.‎

QESHM OVERSEA-CROSSING 230 kV DOUBLE-CIRCUIT TRANSMISSION ‎LINE‎

PERIOD:‎ ‎1988 – 1992‎

EMPLOYER:‎ Hormozgan Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ The shortest distance between the island and land for ‎overhead transmission line was selected with a length of 3300 m. Two specific features of this ‎project were the necessity of using very long spans and ‎making necessary arrangements for installation of tower in ‎the sea which were implemented. The tallest tower used in ‎this project is about 140 m in height and 135 tons in ‎weight. Pad size is 30 x 30 x 70 and chimney is ‎‎70 m high.‎

LOCATION:‎ Qeshm Island, Hormozgan province‎

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ All phases of design, factory tests and supervision on ‎construction work.‎

SPECIAL ACHIEVEMENTS:‎ Construction operation of this project is unique in its ‎kind, and all foundation construction work (especially ‎Caisson foundation on the sea bed) installation of tower and ‎cabling were carried out with special arrangements and a ‎very precise and complicated engineering calculations.‎

VARDAVARD – SIAHBISHE 400 kV TRANSMISSION LINE

PERIOD: 2004 - 2014

EMPLOYER: Tehran Regional Electric Company

A 400 kV single-circuit tri-bundle conductor transmission line, the first and last 3 km of this line will be double circuit. The conductor is curlew conductor, 210, 160 and 300 KN insulators, single-circuit towers are SL3, SH10, TL30 and TH60, double-circuit towers are HS2 and T60. .

LOCATION: Tehran and Mazandaran provinces

STAGE: The project is under construction, and the contractors are performing the installation of towers and cabling of project final phase.

MOSHANIR’S ROLE: Tendering to select contractors, design control, supervision on manufacturing of equipment, and project construction work

 

AGHAREB PARAST – ESLAMABAD TUNNEL AND 230 KV CABLE

PERIOD: 2008 – 2013

EMPLOYER: Esfahan Regional Electric Company

TECHNICAL SPECIFICATIONS: Tunnel boring using NATM method including manual drilling of area between ventilation wells and primary consolidation work such as frame working, mesh, shotcrete, lining work including reinforcement, concreting, construction of tunnel drains after primary consolidation work, construction of power chamber and absorption well.

LOCATION: Esfahan city

STAGE: The project is provisionally delivered and the contractor is eliminating some defects.

MOSHANIR’S ROLE: Preparation of equipment, installation and commissioning based on management contract. The contract is an EPC contract.

JAKIGOOR-CHABAHAR 230 kV TRANSMISSION LINE

PERIOD: 2000 - 2004

EMPLOYER: Sistan and Baluchestan Regional Electric Company

TECHNICAL SPECIFICATIONS: ۲۳۰ kV double-circuit transmission line with a length of ۱۵۰ km, properly designed for low-load and medium-load regions, consisting of canary/AW conductor, shield (ground) wires, OPGW ۱۰.۵ mm, composite insulators, towers T۲-۶۰, T۲-۳۰, HS۲-۱۰ and LS۲-۳

LOCATION: Sistan and Baluchestan province

STAGE: Permanently delivered

MOSHANIR’S ROLE: Equipment supply, installation and commissioning based on the management contract. The contract is an EPC contract.

SPECIAL ACHIEVEMENTS: This project with the minimum cost and best quality in terms of tower design and routing was considered among the best projects of the Ministry of Energy at the time. The project is also the first experience of EPC projects.

COMPREHENSIVE ENGINEERING AND DESIGN STANDARDS FOR IRAN POWER TRANSMISISON LINES

PERIOD: 1995 – 2005

EMPLOYER: Tavanir Company

TECHNICAL SPECIFICATIONS: Formulation of comprehensive design standards, and preparation of technical construction guidelines for power transmission lines, published as Engineering and Design Standards for Transmission Lines.

LOCATION:-

STAGE: Permanently delivered

MOSHANIR’S ROLE: In the first specialized conference on power transmission lines held in Babolsar by Mazandaran Regional Electric Company, Moshanir as the most experienced engineering consulting company in the power industry of Iran was unanimously selected to perform this project.

SPECIAL ACHIEVEMENTS: For the first time in the power industry, comprehensive engineering and design standards for power transmission lines which was the result of more than 30 years of experience and technical knowledge in Moshanir Company was prepared and provided for all experts of transmission lines.

ABADAN-HARESEH 400 kV TRANSMISSION LINE

PERIOD: 2006 – 2007

EMPLOYER: Iran Power Development Company and Iraqi Ministry of Electricity

TECHNICAL SPECIFICATIONS: Line length: 25.3 km, single-circuit line length: 24.5 km, double-circuit line length: 0.8 km, two conductors in each phase, lattice tower, 54 suspension towers, 34 angular towers, silicon rubber insulators, NO. 89γ shield (ground) wire, OPGW10, 10.5 mm, curlew conductor.

LOCATION: Khuzestan province, border of Shalamcheh, Hareseh

STAGE: Permanently delivered

MOSHANIR’S ROLE: Designing, preparation of tender documents, tender formalities, contract with selected contractors, supervision on equipment tests, preparation of technical guidelines, supervision on construction work until project commissioning

KHOY-JULFA-MEGRI 400 kV TRANSMISSION LINES

PERIOD: 2006 – 2008

EMPLOYER: Iran Power Development Company

TECHNICAL SPECIFICATIONS: Curlew 2 conductor, curlew 3 shield (ground) wire, OPGW10.5, single-circuit line: 72.86 km, double-circuit line: 14.4 km, suspension and tension single-circuit towers MA=14, LA=43, HT=24, LT=118.

LOCATION: East and West Azarbaijan provinces

STAGE: Permanently delivered

MOSHANIR’S ROLE: In this project, Moshanir as the main consulting engineer and equipment designer was responsible for drawing and surveying services as well as supervision on construction work, manufacturing, transportation and installation of equipment.

GIS SYSTEM FOR PRODUCTION, TRANSMISSION AND SUB-TRANSMISSION NETWORK OF TEHRAN REGIONAL Electirc COMPANY

PERIOD: 2005 – 2006

EMPLOYER: Tehran Regional Electric Company

TECHNICAL SPECIFICATIONS: Logical modeling to meet current and future requirements of employer, integrated with other infrastructure GIS systems such as road and transportation, water supply and wastewater collection, gas network, urban cadastre, etc. in order to implement national SDI system, geodesic mapping according to project requirements, cartographic modeling according to GIS standard of power industry for the first time in the country.

LOCATION: Tehran, Alborz, Qazvin, Qom, Zanjan, Markazi, Semnan and Mazandaran provinces

STAGE: Permanently delivered

MOSHANIR’S ROLE: Preparation of data bank, data entry software, spatial descriptive data collection and entry, preparation of distribution system

SPECIAL ACHIEVEMENTS: The first and largest GIS project for production, transmission, and sub-transmission network of Tehran Regional Electric Company

SHAHID RAJAEE – VARDAVARD 400 kV TRANSMISISON LINES

PERIOD: 2004 – 2010

EMPLOYER: Tehran Regional Electric Company

TECHNICAL SPECIFICATIONS: Three-curlew conductor double-circuit line with towers TD60, TD30, LSD3 and HSD10, with ceramic insulators

LOCATION: Tehran, Alborz and Qazvin provinces

STAGE: Provisionally delivered

MOSHANIR’S ROLE: In this project, Moshanir as the main consulting engineer provided engineering services for design, preparation of tender documents for selection of construction contractors, supervision on manufacturing, tests and construction work.

SPECIAL ACHIEVEMENTS: Tower lightened by 25%

SHAHID RAJAEE – SHAZAND 400 kV TRANSMISSION LINES

PERIOD: 2004 - 2014

EMPLOYER: Tehran Regional Electric Company

TECHNICAL SPECIFICATIONS: Three-curlew conductor single-circuit line with towers LA, MA, LT and HT, and standard insulators

LOCATION: Qazvin, Lorestan and Markazi provinces

STAGE: In progress .

MOSHANIR’S ROLE: In this project, Moshanir as the main consulting engineer provided engineering services for design, preparation of tender documents for selection of construction contractors, supervision on manufacturing, tests and construction work.

 

ESFAHAN-SORMAGH 400 kV GUYED SUSPENSION TOWER

PERIOD: 2003 – 2009

EMPLOYER: Esfahan Regional Electric Company

TECHNICAL SPECIFICAITONS: 400 kV single-circuit transmission line with a length of 200km, with mono pole guyed suspension towers with 8 guy wires and triangular phased array, with 5 foundations, self-supporting 4-legged tension and angular towers with triangular array, 3 bundles with curlew conductor.

LOCATION: From Mobarakeh in Esfahan province to Sormagh in Fars province

STAGE: Permanently delivered

MOSHANIR’S ROLE: Performance of three stages of engineering services as well as site supervision.

SPECIAL ACHIEVEMENTS: Design, manufacture and installation of guyed towers at the voltage level of 400 kV were done for the first time in Iran.

TABAS-BAFGH 400 kV TRANSMISSION LINE

PERIOD: 2008 – 2009

EMPLOYER: Yazd Regional Electric Company

TECHNICAL SPECIFICAITONS: The 400 kV transmission line with a length of about 275 km has been constructed between Tabas and Bafgh cities and in Dasht-e Kavir. Project towers are of specific design, for Yazd region the towers are of LSH, LAH and MAH types with three-bundle squab conductor.

LOCATION: Between Bafgh and Tabas cities

STAGE: Permanently delivered

MOSHANIR’S ROLE: Engineering services, surveying and site supervision

JAHROM-LARESTAN 400 kV SINGLE-CIRCUIT TRANSMISSION LINE

PERIOD: 2006 – 2011

EMPLOYER: Fars Regional Electric Company

TECHNICAL SPECIFICAITONS: The line is about 167 km long mainly constructed in arduous mountainous routes; all towers were installed using various combinations of towers usable in this line.

LOCATION: Between Jahrom to Larestan and Gerash districts

STAGE: Provisionally delivered

MOSHANIR’S ROLE: Engineering services including routing, surveying, preparation of plan and profile drawings, engineering studies, geological and geotechnical studies, tower installation, preparation of tender documents, purchase and construction contracts

SPECIAL ACHIEVEMENTS: This project was constructed with a various combination of lattice towers and the lowest possible price compared with the similar transmission line projects, double tension insulator strings in spite of tri-bundle conductor.

230 kV HIGH-CAPACITY TRANSMISSION LINES OF SOUTH KAVEH STEEL COMPANY AND SABA STEEL COMPANY

PERIOD: 2010 – 2011

EMPLOYER: South Kaveh Steel Company

TECHNICAL SPECIFICAITONS: 230 kV single-bundle conductor double-circuit transmission line was constructed for the first time in Iran using high capacity Drake/TW/AW conductor. The towers are very tall telescopic towers (35 m from bottom current and 50 m from peak of the pole).

LOCATION: Persian Gulf Special Economic Industrial and Mining Zone

STAGE: Provisionally delivered

MOSHANIR’S ROLE: Moshanir was responsible for geological studies, routing, surveying, line design, tender for purchase and construction, and supervision on construction operations.

SPECIAL ACHIEVEMENTS: For the first time in the country, high capacity Drake /TW/AW conductor was produced and installed, and while power transfer increased from 280 MW to 500 MW per circuit, it led to 35% of financial savings compared with two-bundle conductor. Due to severe pollution of the region, composite insulator with Cree page 10,600 mm was supplied and installed for the first time.

ROYAN-HASSAN KEIF 230/63 kV QUAD-CIRCUIT TRANSMISSION LINE

PERIOD: 2006 - 2014

EMPLOYER: Mazandaran Regional Electric Company

TECHNICAL SPECIFICAITONS: Canary and Lynx conductor, canary core shield (ground) wire, lattice towers M4S-03, M4T-10, M4T-30 and M4T-60, standard ceramic insulators 100, 120 and 160 KN, composite post insulators

LOCATION: Between Kelardasht district – Royan 75 km in length

STAGE: The first 10 km from Kelardasht district has been fully operated and the rest is in the phase of foundation construction.

MOSHANIR’S ROLE: Engineering services, survey work, site supervision

SPECIAL ACHIEVEMENTS: Transmission rate of new towers is twice as much as the existing quad-circuit towers, and the transfer power of the new design increased using compact phased array. Another major feature of these towers is the shortest lateral dimension than existing towers, decreased from 22 m to 14 m, so that the construction of single-circuit line is done without any increase of right off way. Among other merits is the significant decrease of tower weight by 40%.

PROVISION OF TECHNICAL ASSISTANCE FOR EXPERTS OF SYRIAN MINISTRY OF ELECTRICITY

PERIOD: 2001 – 2002

EMPLOYER: Electricity Generation and Transmission Company of Syria

TECHNICAL SPECIFICATIONS: Designing 400/230 kV substations and lines in Syria and supervision on Syrian projects underway such as Turkey-Syria 400 kV transmission line.

LOCATION: Syria

STAGE: Permanently delivered

MOSHANIR’S ROLE: Designing and supervision

SPECIAL ACHIEVEMENTS: Assisting Syrian experts and providing engineering services, and training the Syrian engineers as well as providing training pamphlets were good achievements for Moshanir, and Syrian power authorities were also intimately acquainted with capabilities of Moshanir Company.

POWER NETWORK CONNECTION BETWEEN IRAN AND UNITED ARAB EMIRATES THROUGH 500 KV SUBMARINE HVDC CABLE

PERIOD: 2007 – 2008

EMPLOYER: Tavanir Company – DEWA

TECHNICAL SPECIFICATIONS: Feasibility of 1500 MW power transmission from Iran’s national grid to Dubai through ±500 kV submarine cable with HVDC voltage.

LOCATION: Iran-Emirates

STAGE: Permanently delivered

MOSHANIR’S ROLE: Moshanir was the consulting engineer of the Iranian party i.e. Tavanir Company.

SPECIAL ACHIEVEMENTS: Both companies were acquainted with each other’s capabilities (especially DEWA company was acquainted with potentials of Iran power industry); Iranian experts, especially Moshanir’s experts, gained experience in performance and management of engineering services for offshore projects especially HVDC system

QASTUN – AIN AL-ZARKA 66 kV TRANSMISSION LINE

PERIOD: 2003 – 2005

EMPLOYER: Ministry of Electricity of Syria

TECHNICAL SPECIFICATIONS: Designing 66 kV double-circuit line 30 km in length between Qastun and Ain Al-Zarka substations, implementation of spotting using computer software, preparation of technical specifications, and tender documents volume 2 for purchase and construction of the project, training Employer’s experts, selling Moshanir’s design and spotting softwares to the employer

LOCATION: Syria

STAGE: Permanently delivered

MOSHANIR’S ROLE: Designing and providing engineering services

SPECIAL ACHIEVEMENTS: Performance of this project by Moshanir provided a proper ground for authorities and experts of Syrian power industry to become acquainted with Moshanir’s capabilities and facilities to construct power equipment specially in the field of transmission lines in the country which led to promotion of Syrian power industry authorities’ favorable opinion for future co-operations.

SYRDARYA-SOGDIANA 500 kV TRANSMISSION LINE AND EXTENSION OF SUBSTATION IN UZBEKISTAN

PERIOD: 2006 – 2008

EMPLOYER: SJSC Uzbekenergo

TECHNICAL SPECIFICAITONS: ۵۰۰ kV single-circuit transmission line with Guyed Lattice Tower, composite insulators for power transmission from Syrdarya Power Plant to Sogdiana ۵۰۰/۲۲۰ kV substation with a length of ۲۰۰ km on the outskirts of Samarkand, and extension of ۵۰۰ kV substations in both ends of the said line in Syrdarya Power Plant and Sogdiana region.

LOCATION: Uzbekistan

STAGE: Permanently delivered

MOSHANIR’S ROLE: Engineering services for phases ۱, ۲ and ۳ including preparation of necessary technical specifications, preparation of tender documents, continuous communication with the project financier in order to comply with the bank instructions; preparation and submission of necessary reports, contractual negotiations with contractors and manufactures, preparation and draw up of contract documents, supervision on equipment tests, transportation and installation, and supreme supervision on the operations.

GUZAR-SURKHAN 500 kV TRANSMISSION LINE AND EXTENSION OF SUBSTATION IN UZBEKISTAN

PERIOD: 2008 – 2011

EMPLOYER: SJSC Uzbekenergo

TECHNICAL SPECIFICATIONS: 500 kV single-circuit Guyed Lattice Tower with composite insulators for power transmission from Uzbekistan (500/220 kV substation in Guzar region) to Afghanistan through terminal substation of the said line in Surkhandarya, and extension of 500 kV substations in both ends of the said line

LOCATION: Uzbekistan

STAGE: Permanently delivered

MOSHANIR’S ROLE: Engineering services for phases 1, 2 and 3 including preparation of necessary technical specifications, preparation of tender documents, continuous communication with the project financier in order to comply with the bank instructions; preparation and submission of necessary reports, contractual negotiations with contractors and manufactures, preparation and draw up of contract documents, supervision on equipment tests, transportation and installation, and supreme supervision on the operations.

THIRD ELECTRICITY TRANSMISSION LINE AND HIGH VOLTAGE SUBSTATION OF ARMENIA

PERIOD: 2006 - 2014

EMPLOYER: SUNIR Company

TECHNICAL SPECIFICATIONS: Including 400 kV double-conductor double-circuit transmission line 285 km in length, one 400/200 kV substation the transmission line of which consists of 740 towers with a weight of about 22,000 tons; Glass insulators of 120/160/210 KN are used in this project

LOCATION: Armenia

STAGE: The first phase including project design has finished, and some part of equipment supply has been done.

MOSHANIR’S ROLE: Moshanir has acted as the consulting engineer and project designer; supervision on performance of all contractors was borne by Moshanir.

SECOND ELECTRICITY TRANSMISSION LINE OF ARMENIA

PERIOD: 2003 – 2006

EMPLOYER: SUNIR Company

TECHNICAL SPECIFICATIONS: Including one 220 kV line and one 110 kV line designed according to Russian standards. The length of 220 kV line and 110 kV line are 40 and 30 km, respectively.

LOCATION: Armenia

STAGE: Permanently delivered

MOSHANIR’S ROLE: Supervision on project construction and coordination between contractors and the Employer

SPECIAL ACHIEVEMENTS: Moshanir’s engineers were acquainted with power transmission designs according to Russian Standards (GOST).

330 kV AND 220 kV POWER TRANSMISSION LINES AND SUBSTATIONS OF THE REPUBLIC OF AZERBAIJAN

PERIOD: 2006 – 2009

EMPLOYER: SUNIR Company

TECHNICAL SPECIFICATIONS: 330 kV and 220 kV lines with a length of 330 km, and construction of 2 x 330 kV substations and one 220 kV substation, and extension of 2 x 220 kV substations.

LOCATION: Republic of Azerbaijan

STAGE: Permanently delivered

MOSHANIR’S ROLE: Designing the whole project according to Russian Standards, supervision on project construction work, coordination between contractors and the Employer

SPECIAL ACHIEVEMENTS: Designing the whole project according to Russian Standards (GOST) for the first time, and acquiring the knowledge about line design based on these standards

‎400/230 kV SUBSTATION OF NORTHERN ZAHEDAN‎

PERIOD:‎ ‎2006 – 2013‎

EMPLOYER:‎ Sistan and Baluchestan Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ One breaker and a half busbar, 400 kV four-breaker ring, ‎double busbar, 230 kV busbar, number of 400 kV feeders: two ‎line feeders and two transformer feeders, number of 230 kV ‎feeders: 2 transformer bays + one extension bay and 6 line ‎feeders + 4 extension feeders, a coupling feeder, two shunt ‎reactors, and two neutral reactors, 2 x 315 MVA transformers ‎and DCS control system.‎

LOCATION:‎ 10 km of Iranshahr road, Zahedan city

STAGE:‎ Under operation and ready for provisional delivery

MOSHANIR’S ROLE:‎ Engineering services (phases 1, 2, 3a and 3b) as well as ‎site supervision on construction work of building, and ‎installation

SPECIAL ACHIEVEMENTS:‎ It is the first 400 kV substation in the region.‎

MEHR 400/230 kV SUBSTATION‎

PERIOD:‎ ‎2005 – 2013‎

EMPLOYER:‎ Bakhtar Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ Inverted busbar, 400 kV one breaker and a half busbar, ‎‎230 kV double busbar, number of 400 kV feeders: 4 main ‎feeders, four extension feeders, two transformer feeders, ‎two extension transformer feeders, number of 230 kV feeders: ‎one coupler, eight line feeders + four extension line ‎feeders, two extension transformer feeders, two shunt ‎reactors, two neutral reactors, two 200 MVA transformers, ‎DCS control system.‎

LOCATION:‎ ‎50 km after Arak city via Shazand road

STAGE:‎ Ready for power connection

MOSHANIR’S ROLE:‎ Engineering services (phases 1, 2, 3a and b) as well as site ‎supervision on construction work of building and ‎installation.‎

 

PERSIAN GULF SABA STEEL 230/33 kV GIS SUBSTATION‎

PERIOD:‎ ‎2013 - 2014‎

EMPLOYER:‎ Persian Gulf Saba Steel Company

TECHNICAL SPECIFICATIONS:‎ ‎2 x 230 kV overhead line feeders, 3×230 kV feeders for one ‎‎80 MVA 230/33 kV transformer, 2 x 200 MVA 230/33 kV ‎transformers, one 230 kV bus coupler feeder, one 33 kV ‎incoming feeder for 80 MVA transformer, and 2 x 33 kV ‎incoming feeders for 200 MVA transformer, 33 kV switchgear ‎with the mentioned three incoming feeders, seven outgoing ‎feeders.‎

LOCATION:‎ ‎40 km away from Bandar Abbas city, Hormozgan province

STAGE:‎ Equipment procurement, construction work

MOSHANIR’S ROLE:‎ Engineering services for management contract, and site ‎supervision including preliminary design and preparation of ‎all project specifications, detail design and preparation of ‎technical specifications, preparation and draw up of tender ‎documents for purchase of equipment and tendering to ‎purchase the equipment, technical and financial analysis, ‎contract conclusion, project conformity, inspection and ‎supervision on management contract including review and ‎completion of all operations of project design and ‎management contract in order to make contracts for equipment ‎purchase, construction work, installation, test and ‎commissioning operations.

SHAHID SAMEIE 400/63 kV SUBSTATION‎

PERIOD:‎ ‎2008 - 2014‎

EMPLOYER:‎ Yazd Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ ‎4 x 400 kV feeders, one 400 kV incoming feeder, an outgoing ‎feeder, two transformer feeders with 4 breaker ring scheme ‎‎(one breaker and a half imperfect scheme), 10×63 kV feeders ‎with single busbar scheme with a bus coupler and 2 x 200 MVA ‎transformer bays, telecommunication and dispatching ‎equipment including SCADA, PLC, etc and DCS control system.‎

LOCATION:‎ Khezrabad, Yazd city

STAGE:‎ Under construction and installation

MOSHANIR’S ROLE:‎ Engineering services and site supervision on phases 1, 2 and ‎‎3 including load flow studies, short-circuit current ‎calculations, preparation of single line diagram, layout and ‎section, architectures, structure and foundation of security ‎building and control room, protection and control single ‎line diagrams, AC and DC, preparation of tender documents, ‎financial and technical review of proposals, draw up of ‎contract documents and conformity of design to technical ‎specifications of contract.‎

ABARKOOH 230/132 kV SUBSTATION‎

PERIOD:‎ ‎2012 – 2015‎

EMPLOYER:‎ Yazd Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ ‎2 x 230 kV incoming line feeders extendable to 4 x 230 kV ‎line feeders, 4 x 132 kV outgoing line feeders with ‎considered area for extension, 6 x 132 kV line feeders, ‎‎2 x 230 kV transformer feeders with considered area for ‎extension, one 230 kV transformer feeder, 2 x 132 kV ‎transformer feeders with considered area for extension, ‎‎3 x 132 kV transformer feeders

LOCATION:‎ 15 km of Abarkooh-Yazd road

STAGE:‎ In the field of detail design, designs of civil parts, high ‎voltage equipment, protection control and telecommunication ‎are in progress and in the field of supervision, ‎construction of the second phase of construction work, ‎procurement of equipment, installation and commissioning are ‎under supervision.‎

MOSHANIR’S ROLE:‎ Engineering services, detail design, as well as site supervision on phase 2 ‎construction work, implementation, installation, testing and ‎commissioning

SPECIAL ACHIEVEMENTS:‎ In this project, construction costs of various stages of the ‎project have been decreased through frequent meetings in the ‎field of value engineering.‎

BAHRAMAN 400/132/20 kV SUBSTATION‎

PERIOD:‎ ‎2006 - 2014‎

EMPLOYER:‎ Kerman Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ ‎2 x 400 kV line feeder extendable to four feeders, 2 x 200 ‎MVA 400/132 kV transformer feeder extendable to four ‎feeders, 6 x 132 kV line feeders extendable to ten feeders, ‎‎2 x 50 MVA 132/20 kV transformer feeders, 8 x 20 kV outgoing ‎feeders, arrangement of 400 kV busbar arrangement with 4 ‎breaker scheme (one breaker and a half imperfect scheme), ‎‎132 kV U busbar with coupling feeder and 20 kV single busbar ‎with coupling feeder, 20 kV single busbar with bus coupler, ‎and DCS control system.

LOCATION:‎ Bahraman city

STAGE:‎ Implementation of construction work

MOSHANIR’S ROLE:‎ Engineering services for phases 1, 2 and 3, and site ‎supervision

230 kV GIS MOBILE SUBSTATION

PERIOD:‎ 2007 – 2010‎

EMPLOYER:‎ Kerman Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ One 230/132 kV mobile substation including one 230 kV incoming feeder, 2 x 132 kV outgoing feeders, one 40 MVA transformer, one 230/20 mobile substation including one 230 kV incoming feeder and 4 x 20 kV outgoing feeders, one 25 MVA power transformer

LOCATION:‎ One set in Anbarabad city, the other one in Eslamabad city, Kerman province

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Engineering services for phases 1, 2 and 3

SPECIAL ACHIEVEMENTS:‎ 230 kV mobile substation will be most effective in critical situations such as earthquake, etc.

400/230 kV substation of Kahnooj Power Plant

PERIOD:‎ 2006 - 2014

EMPLOYER:‎ Kerman Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ 6 x 230 kV line feeders extendable to 12 feeders, 3 x 230 kV feeders of the combined-cycle power plant consisting of 2 gas units and one steam unit, 2 x 315 MVA 400/230 transformer feeders extendable to three feeders, 2 x 400 kV line feeders extendable to six feeders, 3 x 400 kV feeders of the combined cycle power plant (future development), 400 kV busbar arrangement with 4-breaker ring scheme (one breaker and a half imperfect scheme), 230 kV one breaker and a half busbars, DCS control system

LOCATION:‎ Kahnooj city

STAGE:‎ Equipment installation of 230 kV substation yard

MOSHANIR’S ROLE:‎ Design of project civil part, engineering services for phases 1, 2 and 3, and site supervision

SPECIAL ACHIEVEMENTS:‎Dividing the project into several phases with respect to the allocated funding in each year, and the project was implemented based on an EPC method.

SHEIKH BAHAEI 400/230/63/20 kV GIS SUBSTAITON

PERIOD:‎ 2005 – 2010

EMPLOYER:‎ Tehran Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ 400 kV section includes: two line feeders with 4-breaker ring scheme, 230 kV section includes two line feeders, two transformer feeders and one bus section feeder with single busbar scheme, 63 kV section includes four overhead line feeders, eight cable line feeders, two transformer feeders, one bus section feeder, 20 kv section includes two incoming feeders, 16 outgoing feeders, one bus section feeder one riser feeder with single busbar scheme.

LOCATION:‎ Hemmat Highway, Tehran

STAGE:‎ Provisional delivery

MOSHANIR’S ROLE:‎ Engineering services for electrical and civil design, equipment supply, and supervision on installation and commissioning including all phases of 1, 2 and 3.

SPECIAL ACHIEVEMENTS:‎Replacement of any 400 kV transformers with the reserve auxiliary transformer in few hours

SIAHBISHE 400 kV SWITCHGEAR, HASSAN KEIF – ZIARAN INCOMING/OUTGOING TRANSMISSION LINES

PERIOD:‎ 2009 – 2014

EMPLOYER:‎ Tehran Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ Three overhead line feeders, four powerplant transformer feeders, one bus coupler feeder, double busbar arrangement usable as main and transfer busbar by bypass-disconnect switches under fault conditions of each feeder breakers, the required space for the fourth line feeder is considered.

LOCATION:‎ Siahbishe village, Karaj–Chalus road

STAGE:‎ Connected to the grid

MOSHANIR’S ROLE:‎ Engineering services for design, construction, equipment supply, supervision on installation, testing and commissioning.

SPECIAL ACHIEVEMENTS:‎ Construction of a gantry with span of 245 m with a strength similar to that of terminal tower for Hassan Keif transmission line, installation of terminal equipment on the berm located on the same gantry, and installation of terminal equipment of other lines on the GIS building and control building roofs

KARBALA AND NAJAF SUBSTATIONS

PERIOD: 2007 – 2013

EMPLOYER: Iran Power Development Company

TECHNICAL SPECIFICATIONS: This project consists of two 132/33 kV fixed substations in Karbala and Kufa, and four 33/11 kV substations including Qods, Al Jami'ah, Maysan and Alasqari, consisting of 4×132 kV line feeders, 3×132/33 kV transformer feeders with double busbar arrangement, 11×33 kV outgoing feeders, three capacitor bank feeders, 3×33/0.4 kV transformer feeders, construction of 33/11 kV substations each one includes 2×33 kV cable line feeders, one bus coupler, 2×33/11 kV transformer feeders, 8×11 kV outgoing feeders and 2×11/0.4 kV transformer feeders.

LOCATION: Karbala city, Najaf city, Iraq

STAGE: Permanently delivered

MOSHANIR’S ROLE: Preparation of tender documents, tendering, contract with contractor, design review, site supervision, provisional and permanent deliveries of substation.

ASALOUYEH 765 kV SUBSTATION

PERIOD: Commenced in September 2010

EMPLOYER: Iran Power Development Company

TECHNICAL SPECIFICATIONS: 765/400 kV GIS substation with DCS system and following specifications: One line feeder, 3×765 kV transformer feeders with a breaker and a half arrangement, four line feeders, 3×400 kV transformer feeders with a breaker and a half arrangement, and 3 x 765/400 kV transformers

LOCATION: Asalouyeh

STAGE: Preliminary studies

MOSHANIR’S ROLE: Preliminary studies, preparation of tender documents, tendering, contract with contractors, design review, site supervision on provisional and permanent deliveries.

SPECIAL ACHIEVEMENTS:‎ Construction of 765 kV transmission lines in order to decrease transmission losses of network

INSTALLATION OF PHASOR MEASUREMENTS UNITS

PERIOD: 2010 – 2013

EMPLOYER: Iran Grid Management Company

TECHNICAL SPECIFICATIONS: At the first phase, Iran Grid Management Company and Tehran Control Center defined pilot installation of 26 phasor measurement units (PMU) in different parts of the country. In fact, collection and processing of these measurements will provide a basis for a relatively strong and new technology for monitoring, protection and control of power networks.

LOCATION: All over the country

STAGE: Provisional delivery

MOSHANIR’S ROLE: Supreme and site supervision on simultaneous measurement of phase 2

KARKHEH 400 kV SUBSTATION

PERIOD: 2011 - 2014

EMPLOYER: Iran Power Development Company

TECHNICAL SPECIFICATIONS: The project consists of completion of existing two 4-breaker ring scheme bays (one breaker and a half) and construction of one breaker and a half bay for Amarah transmission line (power supply to Iraq) as well as construction of the bay related to installation of reactor on the busbar, the reactor is 50 MVAR and 400 kV.

LOCATION: Karkheh

STAGE: Construction work

MOSHANIR’S ROLE: Preparation of tender documents, tendering, contract with contractor, design review, site supervision, provisional and permanent deliveries.

400 kV SUBSTATION OF ABADAN POWERHOUSE

PERIOD: 2007 – 2013

EMPLOYER: Iran Power Development Company

TECHNICAL SPECIFICATIONS: The substation is of DCS type with ۴-breaker ring arrangement convertible into one breaker and a half arrangement, ۲×۴۰۰ kV line feeders, two powerhouse steam unit feeders as well as construction of short power-line communication between two powerhouse units and new feeders.

LOCATION: Abadan city

STAGE: Installation, testing and commissioning

MOSHANIR’S ROLE: Preparation of tender documents, tendering, contract with contractor, design review (electrical, civil), site supervision, provisional and permanent deliveries

DARIAN 230 kV SUBSTATION

PERIOD: 2013 - 2014

EMPLOYER: Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS: The substation has double busbar arrangement with bypass-disconnect switch, 3×230 kV transformer feeders, two line outgoing feeders and one feeder coupler.

LOCATION: Paveh city

STAGE: Design review

MOSHANIR’S ROLE: Design review, preparation of tender documents, tendering, contract with contractor

 

230 kV SUBSTATION OF SEYMAREH POWER PLANT

PERIOD: 2009 – 2013

EMPLOYER: Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS: GIS substation with DCS system and double busbar arrangement with bypass-disconnect switch, three powerhouse feeders, six line feeders, connection between powerhouse transformer and the substation is through the overhead busbar, contract is an EPC contract.

LOCATION: Darreh Shahr

STAGE: Installation, testing and commissioning

MOSHANIR’S ROLE: Design review, site supervision, provisional and permanent deliveries

 

EXTENSION OF BISTOON 400/230 kV SUBSTATION

PERIOD: 2007 – 2013

EMPLOYER: West Regional Power Company

TECHNICAL SPECIFICATIONS: It is a conventional substation. Completion of a 400 kV feeder transformer with a breaker and a half arrangement including on 230 kV 4-breaker ring scheme bay (a breaker and a half) with foundations of power transformers

LOCATION: Bistoon

STAGE: Design review is at the final stage and site supervision is in progress

MOSHANIR’S ROLE: Preparation of tender documents, tendering, contract with contractor, design review, site supervision, provisional and permanent deliveries.

POWER SUPPLY TO MOHSEN STEEL COMPLEX

PERIOD: 2013 – 2015

EMPLOYER: Mohsen Steel Complex

TECHNICAL SPECIFICATIONS: Arrangement of Mehriz 400/63 kV substation is a 4-breaker ring scheme convertible into a breaker and a half arrangement including 2 x 400 kV incoming feeders, 2 x 200 MVA transformer feeders, a 200 MVA transformer feeder for extension of substation. In 63 kV section, the arrangement is a single busbar including two single transformer feeders, six single outgoing feeders, one 63 kV coupler with one single transformer feeder for extension and ten single outgoing feeders for extension.

LOCATION: 15 km of Siman Tejarat-e-Mehriz road, Yazd

STAGE: Design and construction

MOSHANIR’S ROLE: Engineering services, design and site supervision on phases 1, 2 and 3

PAKNEZHAD 63/20 kV GIS SUBSTATION

PERIOD: 2007 – 2013

EMPLOYER: Yazd Regional Electric Company

TECHNICAL SPECIFICATIONS: 63/20 kV GIS Paknezhad substation includes 2 x 63 kV complete feeders, 2 x 63/20 kV transformer feeders, power transformers incoming feeders, 12 x 20 kV outgoing feeders, and coupler with single busbar arrangement, bus coupler, 2 x 20 kV capacitor feeders with 2 x 7.2 MW capacitor banks each with three equal steps.

LOCATION: Yazd City

STAGE: Testing and commissioning phase

MOSHANIR’S ROLE: Engineering services, design and site supervision on phases 1, 2 and 3

SPECIAL ACHIEVEMENTS:‎ The first GIS substation in Yazd province which can be a useful experience in that area, and due to space constraints in design of GIS building which is located within the city, it has been constructed in compliance with all provisions of the province’s cultural heritage.

 

MEDIUM VOLTAGE NETWORK OF TEHRAN REFINERY‎

PERIOD:‎ July 2002 – January 2003‎

EMPLOYER:‎ Tehran Oil Refining Company

TECHNICAL SPECIFICATIONS:‎ Tehran Refinery consists of two old and new power plants ‎with a voltage level of 6 kV isolated from the national grid ‎which feed different load of the refinery plant which are ‎mainly electric motors.‎

LOCATION:‎ Tehran province

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Performance of system studies including load distribution, ‎short circuit, performance of protection coordination, motor ‎starting and network stability.‎

SPECIAL ACHIEVEMENTS:‎ By performance of this project, new setting of refinery ‎relays was calculated and the existing relays were set by ‎the contractor under Moshanir’s supervision.‎

BAM DISTRIBUTION NETWORK DESIGN‎

PERIOD:‎ ‎2005 – 2006‎

EMPLOYER:‎ Kerman Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ Designing the medium and low voltage network of Bam and ‎Baravat cities

LOCATION:‎ Bam city

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ After occurrence of an earthquake in Bam, major parts of ‎medium and low voltage network of Bam and Baravat was devastated ‎and Moshanir designed all medium and low voltage networks of ‎both cities and also supervised the construction work.‎

SPECIAL ACHIEVEMENTS:‎ Designing the new network according to national and ‎international standards, and reducing network losses‎

 

GIS-BASED POWER SUPPLY TO SAVOJBOLAGH IN HASHTGERD NEW TOWN‎

PERIOD:‎ ‎2009 – 2010‎

EMPLOYER:‎ Tehran Electrical Distribution Company (West Distribution ‎Network)‎

TECHNICAL SPECIFICATIONS:‎ Designing of low voltage and distribution networks with ‎respect to urban development and other influential factors

LOCATION:‎ West of Tehran province

STAGE:‎ Provisionally delivered

MOSHANIR’S ROLE:‎ Performance of system studies and complete design

 

SITE SELECTION FOR SMALL-SCALE POWER PLANTS ACROSS ‎DISTRIBUTION NETWORK

PERIOD:‎ ‎2013 - 2014‎

EMPLOYER:‎ East Azerbaijan Electrical Distribution Company

TECHNICAL SPECIFICATIONS:‎ Performance of studies in order to determine the place and ‎optimum capacity of small scale generators at the level of ‎medium-voltage feeders

LOCATION:‎ East Azerbaijan province

STAGE:‎ In progress

MOSHANIR’S ROLE:‎ Engineering services and performance of system studies

SIRI ISLAND CENTRAL POWER PLANT DESIGN STUDIES‎

PERIOD:‎ ‎2013 - 2014‎

EMPLOYER:‎ Iran Offshore Oil Company

TECHNICAL SPECIFICATIONS:‎ Data collection and formulation, demand estimation and ‎design, and network design, designing the central power ‎plant and related network, preparation of tender documents ‎and price estimation

LOCATION:‎ Siri island, Hormozgan province

STAGE:‎ In progress

MOSHANIR’S ROLE:‎ Consulting engineer and base designer of powerhouse, network ‎and accessories

Water

MASJED SOLEYMAN DAM AND POWER PLANT‎

PERIOD:‎1995 – 2010‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ This dam is on Karun river, it is a clay core rockfill dam, ‎and ۱۷۷ m high at base. It has ۵ radial spillway gates with ‎an inflow of ۲۳۰۰ m۳/s (PMF). The power plant consists of ‎four ۲۵۰-MW turbine generators.‎

LOCATION:‎ ‎۲۵.۵ km away from northeast of Masjed Soleyman town

STAGE:‎ Masjed Soleyman Dam was impounded in ۲۰۰۰, and power plant ‎units were connected to the national grid between ۲۰۰۲–۲۰۰۳, ‎minor and complementary work of the project lasted until ‎‎۲۰۱۰.‎

MOSHANIR’S ROLE:‎ Moshanir has performed all phases of engineering services ‎including reconnaissance, phases ۱, ۲ and ۳ based on a joint ‎venture agreement.‎

BAKHTIARI DAM AND POWER PLANT

PERIOD:‎ Commenced in June 2005‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ Double curvature concrete arch dam, height ۳۱۵ m from ‎foundation, foundation height ۱۰ m, crest length ۵۰۹ m, ‎foundation width ۵۰ m, crest width ۱۰ m, reservoir capacity ‎‎۴۸۴۵ million cubic meters, reservoir surface area ۵۸.۷ km۲, ‎reservoir length ۵۹ km.‎

LOCATION:‎ In lower part of Bakhtiari river in Lorestan Province and in ‎southwestern slopes of Zagros Mountains

STAGE:‎ Construction of diversion system and access ways

MOSHANIR’S ROLE:‎ Implementation of the second phase designs, engineering ‎services as well as supervision on construction work of dam ‎and power plants

SPECIAL ACHIEVEMENTS:‎ The world’s tallest double curvature concrete arch dam ۳۱۵ m ‎in height, the country’s second largest artificial reservoir ‎after Karkheh with a capacity of ۴.۸ billion cubic meters at ‎normal elevation, negligible damage caused by the reservoir ‎in terms of social issues, power plant capacity ۱۵۰۰ MW.‎

SIAHBISHE PUMPED STORAGE DAM AND POWER PLANT

PERIOD:‎ ‎2003 – 2014‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ Upper dam is a concrete-face rockfill dam which is ۸۲.۵ m ‎tall, ۲۱۵ m wide at its foundation. Its reservoir has an ‎active storage capacity of ۳.۶ million cubic meters, the ‎lower dam is also a concrete-face rockfill dam, ۱۰۲ m tall, ‎‎۳۸۲ m wide at its foundation, the reservoir has an active ‎storage capacity of ۳.۸ million cubic meters, the powerhouse ‎is an underground pumped storage type with four vertical ‎Francis turbines.‎

LOCATION:‎ Adjacent to Siahbishe village

STAGE:‎ Completion of dam construction operations, and commissioning ‎of powerhouse units

MOSHANIR’S ROLE:‎ Engineering services for tendering, supreme supervision, ‎management and control of design review, and site ‎supervision

SPECIAL ACHIEVEMENTS:‎ The country’s first pumped storage dam, hydroelectric power ‎generation capacity of ۱۰۴۰ MW at peak hours, consumption of ‎electrical power with a capacity of ۹۶۰ MW during low-load ‎hours

SHAMIL RESERVOIR DAM

PERIOD:‎ 1994-2009‎

EMPLOYER:‎ Hormozgan Regional Water Company

TECHNICAL SPECIFICATIONS:‎ Shamil reservoir dam project is started to prevent from seasonal flooding and collecting water for agricultural purposes. Other specifications of the dam are: clay core earth-fill dam with the height of 32.3 m and crest length of 1200 m, surface water intake and deep discharge system, underground pumped storage type situated in the upstream of the dam.‎

LOCATION:‎ 70 km from Bandar - e - Abbas city to Minab city

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Study, design and supervision

NIAN RESERVOIR DAM

PERIOD:‎ 1994-2009‎

EMPLOYER:‎ Hormozgan Regional Water Company

TECHNICAL SPECIFICATIONS:‎ Shamil reservoir dam project is started to prevent from seasonal flooding and collecting water for agricultural purposes. Other specifications of the dam are: clay core earth-fill dam with the height of 27.3 m and crest length of 510 m, 4 radial spillway gates with an inflow of 4630 m3/s surface water, artificial feeding intake and semi-deep discharge system.

LOCATION:‎ 70 km from Bandar - e - Abbas city to Minab city

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Study, design and supervision

ZHAVEH RESERVOIR DAM & WATER TRANSFER SYSTEM

PERIOD:‎ ‎Commenced in 2008‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ Zhaveh reservoir dam with a height of 86.5 m and a crest length of 300 m has been constructed at altitudes above 2000 m.a.s.l. in order to supply agricultural and industrial water for the existing plains. A pipeline and six pumping stations are used to transfer 123 million cubic meters of water from Zhaveh dam annually.

LOCATION:‎ 40 km away from southwest of Sanadaj city, east of Kurdistan province

STAGE:‎ In progress

MOSHANIR’S ROLE:‎ Review of preliminary studies, performance of studies phase II, supreme and site supervision

SPECIAL ACHIEVEMENTS:‎ This dam is the largest roller-compacted concrete dam of the country which holds a record of 121,000 m3 of concreting per month. Given the capacity and dynamic pumping head of 900 m, the water transfer system is one of the largest water transfer systems of the country.

POWER PLANT OF ZAYANDEHROUD REGULATING DAM‎

PERIOD:‎ Commenced in May 2011‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ An 8.5-MW power plant including two 4.25-MW units, the ‎contract is an EPC contract.‎

LOCATION:‎ ‎110 km away from west of Isfahan City

STAGE:‎ Selection of Contractor

MOSHANIR’S ROLE:‎ Supervision on project design and construction

 

MASJED SOLEYMAN DAM AND POWER PLANT‎

PERIOD:‎1995 – 2010‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ This dam is on Karun river, it is a clay core rockfill dam, ‎and 177 m high at base. It has 5 radial spillway gates with ‎an inflow of 2300 m3/s (PMF). The power plant consists of ‎four 250-MW turbine generators.‎

LOCATION:‎ ‎25.5 km away from northeast of Masjed Soleyman town

STAGE:‎ Masjed Soleyman Dam was impounded in 2000, and power plant ‎units were connected to the national grid between 2002–2003, ‎minor and complementary work of the project lasted until ‎‎2010.‎

MOSHANIR’S ROLE:‎ Moshanir has performed all phases of engineering services ‎including reconnaissance, phases 1, 2 and 3 based on a joint ‎venture agreement.‎

SHAMIL RESERVOIR DAM

PERIOD:‎ 1994-2009‎

EMPLOYER:‎ Hormozgan Regional Water Company

TECHNICAL SPECIFICATIONS:‎ Shamil reservoir dam project is started to prevent from seasonal flooding and collecting water for agricultural purposes. Other specifications of the dam are: clay core earth-fill dam with the height of 32.3 m and crest length of 1200 m, surface water intake and deep discharge system, underground pumped storage type situated in the upstream of the dam.‎

LOCATION:‎ 70 km from Bandar - e - Abbas city to Minab city

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Study, design and supervision

NIAN RESERVOIR DAM

PERIOD:‎ 1994-2009‎

EMPLOYER:‎ Hormozgan Regional Water Company

TECHNICAL SPECIFICATIONS:‎ Shamil reservoir dam project is started to prevent from seasonal flooding and collecting water for agricultural purposes. Other specifications of the dam are: clay core earth-fill dam with the height of 27.3 m and crest length of 510 m, 4 radial spillway gates with an inflow of 4630 m3/s surface water, artificial feeding intake and semi-deep discharge system.

LOCATION:‎ 70 km from Bandar - e - Abbas city to Minab city

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Study, design and supervision

ZHAVEH RESERVOIR DAM & WATER TRANSFER SYSTEM

PERIOD:‎ ‎Commenced in 2008‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ Zhaveh reservoir dam with a height of 86.5 m and a crest length of 300 m has been constructed at altitudes above 2000 m.a.s.l. in order to supply agricultural and industrial water for the existing plains. A pipeline and six pumping stations are used to transfer 123 million cubic meters of water from Zhaveh dam annually.

LOCATION:‎ 40 km away from southwest of Sanadaj city, east of Kurdistan province

STAGE:‎ In progress

MOSHANIR’S ROLE:‎ Review of preliminary studies, performance of studies phase II, supreme and site supervision

SPECIAL ACHIEVEMENTS:‎ This dam is the largest roller-compacted concrete dam of the country which holds a record of 121,000 m3 of concreting per month. Given the capacity and dynamic pumping head of 900 m, the water transfer system is one of the largest water transfer systems of the country.

CHITI DAM AND POWER PLANT OF LALI CITY‎

PERIOD:‎ ‎2012 – 2016‎

EMPLOYER:‎ Khuzestan Water and Power Authority

TECHNICAL SPECIFICATIONS:‎ Chiti dam has a catchment area of about 864 square ‎kilometers. Mean annual inflow to the reservoir is 685 ‎million cubic meters per year and the main purpose of this ‎dam is hydroelectric power generation. Dam body is made of ‎concrete, its height is 135 m, and total volume of the ‎reservoir is 600 million cubic meters.‎ The powerhouse consists of two units with an installed ‎capacity of 72 MW and its mean annual energy production will ‎be 184 GWh/year.‎

LOCATION:‎ Khuzestan province

STAGE:‎ Studies of phase II

MOSHANIR’S ROLE:‎ Performance of studies of phase II and preparation of tender ‎documents

TAZERAN DAM‎

PERIOD:‎ 2010 – 2012

EMPLOYER:‎ Lorestan Regional Water Company

TECHNICAL SPECIFICATIONS:‎ Clay core earthfill dam with alluvial foundation, crest elevation 2076 m.a.s.l., dam normal level 2072 m.a.s.l., minimum operation level 2054 m.a.s.l., dam height 44.6 m from alluvial foundation bed, crest length 381.5 m, reservoir normal volume 1.35 million cubic meters, volume of body materials 513,000 m3, excavation volume 37,000 m3, reservoir spillway volume 0.054 million cubic meters, diversion system in form of a steel pipe with a diameter of 2 m in the left bank, crest width 10 m, upstream cofferdam height 10 m, upstream cofferdam crest elevation 2047.5.‎

LOCATION:‎ 14 km away from northeast of Azna, 16 km away from northwest of Aligudarz district

STAGE:‎ Completed

MOSHANIR’S ROLE:‎ Performance of first stage studies

BIDESTAN DAM

PERIOD:‎ 2010 – 2012

EMPLOYER:‎ Lorestan Regional Water Company

TECHNICAL SPECIFICATIONS:‎ Clay core earthfill dam with alluvial foundation, dam crest elevation 2220.4, dam normal elevation 2215, minimum operation elevation 2195, dam height from alluvial foundation bed 42 m, crest length 510 m, reservoir normal capacity 3.85 million cubic meters, body materials volume 915,000 m3, excavation volume 49,000 m3, reservoir spillway capacity 0.57 million cubic meters, diversion system as a concrete culvert with dimensions of 3 x 3 m in right bank, crest width 10 m, upstream cofferdam height 8 m, upstream cofferdam elevation 2188.‎

LOCATION:‎ Adjacent to Bidestan village in south of Shazand city

STAGE:‎ Completed

MOSHANIR’S ROLE:‎ Performance of studies of phase I

 

MULTI-EFFECT DISTILATION PLANT (MED) OF BANDAR ABBAS THERMAL POWER PLANT

PERIOD:‎ 2008 - 2009

EMPLOYER:‎ Hormozgan Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ In order to satisfy water requirements of power plant steam units by existing water desalination plants, design and construction of the third multi-effect distillation plant with a capacity of 2400 m3 per day were addressed.

LOCATION:‎ Steam power plant of Bandar Abbas city

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Performance of phase zero studies, review of proposed design, review of drawings, supervision on construction, installation, purchase, performance of all tests as well as permanent delivery and operation.

REVERSE OSMOSIS BLOWDOWN WATER TREATMENT SYSTEM OF SHAHID MOFATEH POWER PLANT, HAMADAN

PERIOD:‎ 2011 - 2012

EMPLOYER:‎ Bakhtar Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ Cooling tower blow down water treatment and restoration of treated water to recirculating water of towers using reverse osmosis

LOCATION:‎ Shahid Mofateh power plant of Hamadan city

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Supervision on installation work, preparation of required reports for operation, supervision on commissioning, supervision on preparation and delivery of drawings, documents, operation and maintenance instructions, supervision on preparation and delivery of spare parts lists and as-built drawings

CONSTRUCTION OF TEHRAN WATER TREATMENT PLANT NO. 6‎

PERIOD:‎ 2009 - 2014

EMPLOYER:‎ Tehran Regional Water Company

TECHNICAL SPECIFICATIONS:‎ Treatment plant consists of a stilling basin, a parshall flume unit, three trash racks, six rapid mixing units, six pulsator clarifiers, 24 rapid gravity two-layer filters, chlorine-based primary and secondary disinfectants, 25,000 cubic meter storage tank, chemical buildings, chlorination, general and auxiliary operation with a capacity of 15 m3/s.

LOCATION:‎ Highlands of district 22 of Tehran

STAGE:‎ Design and construction

MOSHANIR’S ROLE:‎ Employer’s Engineer for design and site supervision

SPECIAL ACHIEVEMENTS:‎ Design and selection of two-layer filters with higher efficiency than conventional filters (single layer), construction of filters structure on the storage tank in order to maintain water level, also due to specific topography of the treatment plant, layout of microstrainers, pulsator structures, filters and tank was considered outside the high voltage power lines right off way which pass through the treatment plant.

WATER TRANSFER TUNNEL FROM DOWNSTREAM OF AMIR KABIR DAM TO TEHRAN TREATMENT PLANT NO. 6

PERIOD:‎ 2009 - 2013

EMPLOYER:‎ Tehran Regional Water Company

TECHNICAL SPECIFICATIONS:‎ Tunnel slope 0.177%, finished diameter after lining 3.9 m, full section mechanized drilling system using double shield TBM with a minimum turning radius of 300 m, design discharge 16 m3/s, forced ventilation jet fan, gravity-pumped drainage system, rail-crane transportation and unloading

LOCATION:‎ Chalus road

STAGE:‎ Completion of tunnel structural operation, regulating weir and intake structure, tunnel is in the provisional delivery phase, and weir and intake structure are in the equipment installation phase.

MOSHANIR’S ROLE:‎ Employer’s Engineer for design and site supervision

SPECIAL ACHIEVEMENTS:‎ Selection of a specific pozzolan cement to neutralize alkaline reaction of segment concrete materials, selection of intake in downstream of regulating dam instead of impounding from regulating dam reservoir, management and complete and full time supervision on TBM overhaul operations

STUDIES ON LONG-TERM WATER SUPPLY TO ILAM CITY

PERIOD:‎ 2007 – 2008

EMPLOYER:‎ Ilam Regional Water Company

TECHNICAL SPECIFICATIONS:‎ Studies on long-term water supply to Ilam city including identification of potentials, and selection of various alternatives for water supply to Ilam city and its industries and satellite towns

LOCATION:‎ Ilam capital city

STAGE:‎ Completed

MOSHANIR’S ROLE:‎ Engineering services for reconnaissance studies on the existing potentials of water resources and transfer method to project destination

SPECIAL ACHIEVEMENTS:‎ Increasing the amount of drinking and non-drinking water needs of Ilam for the target year

STUDIES ON WATER SUPPLY TO SHAHID MOFATEH POWER PLANT IN HAMADAN

PERIOD:‎ 2003 – 2004

EMPLOYER:‎ Bakhtar Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ Studies on water supply to Shahid Mofateh Power Plant of Hamadan including identification of potentials, and selection of various alternatives for water supply to the power plant

LOCATION:‎ 45 km away from northeast of Hamadan city

STAGE:‎ Completed

MOSHANIR’S ROLE:‎ Engineering services for reconnaissance studies on the existing potentials of water resources and transfer method to the project destination.

SPECIAL ACHIEVEMENTS:‎ Increasing the amount of water needed for the plant

WATER SUPPLY TO QATAR

PERIOD: 1992 – 1993

EMPLOYER: Ministry of Water and Electricity of Qatar

TECHNICAL SPECIFICATIONS: 5 m3/s water transfer from Karun river in Southern Iran to northern-most point of Qatar including determination of river diversion route, intake, water treatment, transfer through a pipeline 800 km in length consisting of onshore and offshore pipeline route in the Persian Gulf, pumping stations and water tanks.

LOCATION: Persian Gulf

STAGE:‎ Delivered

MOSHANIR’S ROLE: Implementation of preliminary feasibility studies

 

ZHAVEH RESERVOIR DAM & WATER TRANSFER SYSTEM

PERIOD:‎ ‎Commenced in 2008‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ Zhaveh reservoir dam with a height of 86.5 m and a crest length of 300 m has been constructed at altitudes above 2000 m.a.s.l. in order to supply agricultural and industrial water for the existing plains. A pipeline and six pumping stations are used to transfer 123 million cubic meters of water from Zhaveh dam annually.

LOCATION:‎ 40 km away from southwest of Sanadaj city, east of Kurdistan province

STAGE:‎ In progress

MOSHANIR’S ROLE:‎ Review of preliminary studies, performance of studies phase II, supreme and site supervision

SPECIAL ACHIEVEMENTS:‎ This dam is the largest roller-compacted concrete dam of the country which holds a record of 121,000 m3 of concreting per month. Given the capacity and dynamic pumping head of 900 m, the water transfer system is one of the largest water transfer systems of the country.

OPTIMIZATION OF DEZ POWER PLANT EQUIPMENT

PERIOD:‎ October 2006

EMPLOYER:‎ Khuzestan Water and Power Authority

TECHNICAL SPECIFICATIONS:‎Optimization of electromechanical and Hydromechanical equipment of Dez Power Plant

LOCATION:‎ Dez Dam and Power Plant, 25 km away from northeast of Dezful and Andimeshk cities

STAGE:‎ Implementation of construction operations

MOSHANIR’S ROLE:‎ The third phase including supreme supervision, design review and approval, supervision on construction, installation and commissioning

SPECIAL ACHIEVEMENTS:‎ Dez Power Plant consists of eight 65 MW units, and after optimization of the equipment, the units capacity will increase to 90 MW, and output capacity of the power plant will reach from 520 MW to 720 MW.

PC2 ROCK STABILIZATION OF DEZ DAM

PERIOD:‎ 2002-2006

EMPLOYER:‎ Khuzestan Water and Power Authority

TECHNICAL SPECIFICATIONS:‎The goal of the project is to harness the unstable PC2 rock in the highest point of the right hand of the Dez dam, overlooking the power plant and high voltage substation with 75 strands to pull back the rock. Work load of each strand is 63 tones and total strands forces 4725 tones to the rock.

LOCATION:‎ Dez Dam and Power Plant, 25 km away from northeast of Dezful and Andimeshk cities

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ Design and supervision

Transportation

TEHRAN METRO LINE 3

PERIOD:‎ Commenced in 2006

EMPLOYER:‎ Gostaresh Rail Transportation Industries Development Company (RTI)

TECHNICAL SPECIFICATIONS:‎ Tehran Metro Line 3 is 33 km long, with 28 km as a subway and 5 km elevated. This line consists of 26 stations which connects northeast of Tehran to southwest. This line and lines 1, 4, 6, 7 and 8 will cross each other.

LOCATION:‎ This line starts from Lashgarak highway in northeast Tehran and by passing through Imam Ali Highway (PBUH), Madjidiyeh, Shahid Beheshti Avenue, and crossing Vali-e-Asr Avenue, it goes to Rah Ahan Square, Javadiyeh, Ghale Morghi, Azadegan Highway, Chahar Dangeh and Eslamshahr.

STAGE:‎ In progress

MOSHANIR’S ROLE:‎ Contractor’s Engineer for design and construction

SPECIAL ACHIEVEMENTS:‎ This line consists of 26 underground stations (of total 28 stations), a roundhouse and one terminal. 56 rows of trains with a capacity of 1500 passengers are required. The headway will be two minutes and final transportation capacity of passengers will be 45,000 passengers per hour in each direction.

KARAJ METRO LINE 4

PERIOD:‎ Commenced in 2008

EMPLOYER:‎ Karaj Urban and Suburban Railway Organization

TECHNICAL SPECIFICATIONS:‎ The line is 18 km long, of which 17 km are subway. This line consists of 19 stations and connects northwest of Karaj to southwest. This line and lines 1, 2 and 3 of Karaj will cross each other.

LOCATION:‎ Karaj Metro Line 4 starts from Baghestan in northwest of Karaj and by passing through Golshahr, West Golzar street and Imam Khomeini boulevard of Mehrshahr, it extends to Payam airport in southwest of Karaj.

STAGE:‎ In progress

MOSHANIR’S ROLE:‎ Management Contract

SPECIAL ACHIEVEMENTS:‎ This line consists of 17 underground stations (out of 19 stations), a roundhouse and a terminal in the south of route, and a parking lot has been considered in north of the line. 24 rows of trains with a capacity of 1500 passengers are required. The headway will be 2.5 minutes and final transportation capacity will be 35,700 passengers per hour in each direction.

TEHRAN-MASHHAD RAILWAY ELECTRIFICATION

PERIOD: 2012 - 2014

EMPLOYER: Islamic Republic of Iran Railways

TECHNICAL SPECIFICATIONS: The track is ۹۲۶ km long. Power supply to electric trains is done through high voltage substations as well as ۳ x ۲۵ kV substations feeding the overhead catenary system.

LOCATION: Tehran, Semnan, and Razavi Khorasan provinces

STAGE: The first and second parts are being taken over from the contractors.

MOSHANIR’S ROLE: In this project, Moshanir provides engineering services for power, signaling, and tracks, substations for overhead catenary system and upstream substations, supervision on construction work is also performed by Moshanir.

Building

17Storey Main Building of Moshanir

PERIOD: 2002-2015

EMPLOYER: Moshanir Company

TECHNICAL SPECIFICATIONS: This building with the area over 40000 square meters, 17 floors includes 6 underground floors with 392 parking spaces, 11-storey office, around 10,500 square meters of building facades, 46 meters height form the street level, 68 meters height from the foundation level, steel structure with rigid frames, bolted connections, Composite roofing, 3 chillers with the capacity of 400 tons and ceiling fan coils.

LOCATION: Attar Street, Vanak Square, Tehran

STAGE: Finish Work

MOSHANIR’S ROLE: All engineering services including preliminary studies, design, detailed design and implementation of the project

Office Building and Amphitheater of Yazd Regional Electric Company

PERIOD: 1993-1996

EMPLOYER: Yazd Regional Electric Company

TECHNICAL SPECIFICATIONS: This building, with about 10,000 square meters, was constructed according to traditional architecture and climatology in the city of Yazd. The building, in addition to the main administrative building, includes restaurant-amphitheater with a capacity of 200 people, sumptuous reception rooms and conference halls. The building is constructed in an area of over 5,000 square meters.

LOCATION: Yazd City

STAGE: Permanently Delivered

MOSHANIR’S ROLE: Moshanir carried out all stages of engineering services including reconnaissance studies, feasibility studies, preparation of tender documents for civil and equipment works, detailed design and supervision.

Royan Pars Tous Seven-Star Hotel and Commercial Complex

PERIOD: 2014-2016

EMPLOYER: Royan Pars Tous Investment and International Development Company

TECHNICAL SPECIFICATIONS: Hotel and apartments up to ۱۴۵۲۴۱ m۲, one and two-storey villas with total area of ۱۶۷۶۷ m۲, aqua park with an area about ۳۲۶۰۷ m۲, central commercial structure with an area about ۹۶۸۱۴ m۲ and a parking lot with an area of ۳۲۶۰۷ m۲ .

LOCATION: In the western highlands of Koohsangi, overlooking the city of Mashhad

STAGE: Project has construction permit in an area of ۴۷ hectares and ۱۳۸,۸۰۷ square meters from which ۷۲۲۶۴.۵ square meters have already been constructed and ۳۳۹۲۸ square meters has been allocated to seven-star hotel.

MOSHANIR’S ROLE: Design review and optimization, design verification, control and supervision on the implementation of structures and supreme supervision

Environment

ENVIRONMENTAL IMPACT ASSESSMENT STUDIES ON COMBINED CYCLE POWER PLANT OF ALMAHDI ALUMINIUM COMPLEX

PERIOD: 2010 – 2012

EMPLOYER: Almahdi Aluminium Complex

TECHNICAL SPECIFICATIONS: To meet the power requirements of Almahdi Aluminium Complex, construction of 1106.5 MW combined cycle power plant was addressed. In order to maximize the use of existing facilities and infrastructure and reduce side costs, it is planned to construct the power plant inside of Almahdi Aluminium Complex.

LOCATION: Bandar Abbas city

STAGE: Completed

MOSHANIR’S ROLE: Studies on review, reconnaissance and assessment of negative and positive impacts of the project on the region’s environment as well as provision of strategies to abate the adverse impacts and to increase the positive impacts resulting from the construction and operation; The assessment results were submitted for the approval of Assessment Office in order to obtain the permit from Environment Protection Organization for commencement of project construction work.

SPECIAL ACHIEVEMENTS: Environmental, air pollution, and ecological expertise was used in this project.

ENVIRONMENTAL IMPACT ASSESSMENT STUDIES ON 132 kV SUBMARINE CABLE PROJECT OF KISH ISLAND

PERIOD: 2009 - 2014

EMPLOYER: Iran Power Development Company

TECHNICAL SPECIFICATIONS: 132 kV submarine cable of Kish Island is designed for electrical energy transmission from nearby Aftab Port (Garzeh) to Kish Island. This transmission line will be 21 km long all of which will be laid on the Persian Gulf bed, between Kish Island and the main island. It is required to mention that this submarine transmission line will consist of two parallel cables with a distance of 150 m from each other.

LOCATION: Between Garzeh port and Kish island

STAGE: Study phase

MOSHANIR’S ROLE: Studies on review, reconnaissance and assessment of negative and positive impacts of the project on the region’s environment as well as provision of strategies to abate the adverse impacts and to increase the positive impacts resulting from the construction and operation; The assessment results were submitted for the approval of Assessment Office in order to obtain the permit from Environment Protection Organization for commencement of project construction work.

STUDIES ON FORMULATION OF ENVIRONMENTAL MANAGEMENT AND MONITORING PLAN FOR FISHING PORTS OF THE COUNTRY

PERIOD: 2007 – 2008

EMPLOYER: Department of Studies and Construction of Fishing Ports of Iran Fisheries Organization

TECHNICAL SPECIFICATIONS: Formulation of environmental management and monitoring plan for fishing ports of the country aligned with plans and macro goals of Iran Fisheries Organization in order to help maintain and further improve the environmental quality of coastal areas of the country particularly in the areas of fishing ports.

LOCATION: Ports of Abadan, Imam Khomeini, Khour-e-Samayeli, Nahr-e-Ghasr, Babolsar, Amirabad, Anzali, Astara, Kiashahr

STAGE: Completed

MOSHANIR’S ROLE: Performance of studies in accordance with legal requirements, explanation of environmental aspects and impacts of fishing ports activities, development of management or technical strategies related to each of identified adverse environmental impacts, economic analysis of strategies and possibility of implementing them with respect to budget constraints, feasibility of strategies without needing a special technical knowledge or expertise, conforming with existing organizational structure of fishing ports

DETERMIATION OF SOCIAL COSTS OF NOX, SO2 AND CO2 IN THE ENERGY SECTOR OF THE COUNTRY

PERIOD: 2006 – 2008

EMPLOYER: Deputy for Power and Energy Affairs of Ministry of Energy

TECHNICAL SPECIFICATIONS: Achievement of adjustment factors for social costs of greenhouse gas, review of various indices affecting determination of social costs of greenhouse gas, and preparation of a field to achieve national factors of social costs of greenhouse gas.

LOCATION: ...

STAGE: Completed

MOSHANIR’S ROLE: Review of concepts of social costs and external costs in the field of environmental economics, review and analysis of health and environmental impacts of greenhouse gas pollutants, review of calculation process and estimation methods of social costs of greenhouse gas pollutants in Iran and analysis of advantages and disadvantages of these methods, analysis of provided methods in the field of greenhouse gas pollutants, determination of relevant social indices with respect to socio-economic and environmental conditions of Iran, determination and localization of the factors in order to estimate social costs, determination of social costs of greenhouse gas pollutants for Iran, determination of social costs of greenhouse gas pollutants.

ENVIRONMENT IMPACT ASSESSMENT OF VANAK DAM AND IRRIGATION NETWORK

PERIOD: 2010 - 2014

EMPLOYER: Chaharmahal and Bakhtiari Regional Water Company

TECHNICAL SPECIFICATIONS: Vanak clay-core rockfill reservoir dam, with a height of 64.5 m and normal operation elevation of 2100 m a.s.l. water transfer system of this project is designed to transfer water from the reservoir to land of adjacent plains as well as to supply some part of drinking and non-drinking water needs and to strengthen Dasht-e Khan Mirza aquifer.

LOCATION: Chaharmahal and Bakhtiari province

STAGE: Preparation and submission of final report

MOSHANIR’S ROLE: Consulting engineer for obtaining environmental permit for the project

SPECIAL ACHIEVEMENTS: Increase in cultivation area of adjacent plains of Vanak Dam

ENVIRONMENTAL RISK ASSESSMENT STUDIES OF SUNGUN COPPER COMPLEX

PERIOD: 2007-2009

EMPLOYER: National Iranian Copper Industries Company (Sungun Copper Complex)

TECHNICAL SPECIFICATIONS: Environmental risk identification, assessment and categorization of Sungun Copper Complex activities related to destruction of vegetation and contamination of groundwater supply

LOCATION: 130 km of north Tabriz city, east Azerbaijan province

STAGE: Completed

MOSHANIR’S ROLE: First phase studies including data gathering, previous environmental studies analysis and determination of their weaknesses and strengths based on national and international standards. Second phase studies including identification and categorization of potential risks, hazard scenarios analysis, causes of errors, the manner of their occurrence and available controls, impact estimation, determination of pollutants. Third phase analysis containing system identification, risk categorization and giving managerial solutions

Health Impact Assessment of Southern Tehran Contaminated Surface Water Regulatory Project

PERIOD: 2018-2019

TECHNICAL SPECIFICATIONS: Review of the impact of this project (comprising Salehabad and Sorkhe Hesar water treatment plants, conveyance line and construction of modular tanks for wastewater storage and regulation) on health of the personnel and residents of Tehran, Rey and Robatkarim cities, review of the method of using the treated wastewater and the method of sludge disposal in the treatment plants.

- The process of wastewater treatment for both plants is based on MBBR technology and chemical sludge stabilization with lime.

STAGE: Completed

LOCATION: Tehran, Rey and Robatkarim counties

MOSHANIR’S ROLE: Project consultant

SPECIAL ACHIEVEMENTS: - Identification of the health status of the region - Identification of the most important contagious and non-contagious diseases in the region - Identification of the most important diseases attributable to the project. - Development of control measures plan and monitoring plan for the most important impacts of the project.

Health Impact Assessment of Shahr-e Qods and Safadasht Treatment Plants

PERIOD: 2019-2020

EMPLOYER: Department of Water & Wastewater Towns & Suburbs of Southern Tehran

TECHNICAL SPECIFICATIONS: Review of the impact of construction of Shahr-e Qods and Safadasht wastewater treatment plants on health of the personnel and residents of these cities and downstream villages, review of treated wastewater utilization method and the method of sludge disposal in the treatment plants.

- This treatment plant comprises Three modules and six flow lines, and the treatment process is based on extended aeration and removal of nitrogen and phosphorous (A2O).

STAGE: First Phase

LOCATION: Shahr-e Qods and Malard counties

MOSHANIR’S ROLE: Project consultant

SPECIAL ACHIEVEMENTS: - - Identification of the health status of the region - Identification of the most important contagious and non-contagious diseases in the region - Identification of the most important diseases attributable to the project - Development of control measures plan and monitoring plan for the most important impacts of the project

Health Impact Assessment of Wastewater Treatment Plants of Qarchak, Varamin and Pakdasht Cities

PERIOD: 2019-2020

EMPLOYER: South East Tehran Water and Wastewater Company

TECHNICAL SPECIFICATIONS: The health report has been approved as per paragraph (b) of Article 32 of the Fifth Development Plan and the resolution dated June 15, 2013 passed by the Supreme Council for Health and Food Security, and also set of national health standards for major development projects such as wastewater treatment plants have been notified to all executive bodies. This project reviews the impact of construction of wastewater treatment plants of Qarchak, Varamin and Pakdasht cities on health of the personnel and residents of the project area, the treated wastewater utilization method and the method of treatment plants sludge disposal. Each treatment plant of Qarchak, Varamin and Pakdasht comprises two modules and four flow lines, and the treatment process is based on A2O, and none of modules have been constructed.

STAGE: First Phase

LOCATION: Tehran, Rey and Robatkarim counties

MOSHANIR’S ROLE: Project consultant

SPECIAL ACHIEVEMENTS: - - Identification of the health status of the region - Identification of the most important contagious and non-contagious diseases in the region - Identification of the most important diseases attributable to the project - Development of control measures plan and monitoring plan for the most important impacts of the project

Health Impact Assessment of Wastewater Treatment Plants (Vavan-Eslamshahr, Parand, Baharestan, Robat Karim)

PERIOD: 2019-2020

EMPLOYER: South West Tehran Water and Wastewater Company

TECHNICAL SPECIFICATIONS: Preparation of Health Impact Assessment report has been approved as per paragraph (b) of Article 32 of the Fifth Development Plan and the resolution dated June 15, 2013 passed by the Supreme Council for Health and Food Security, and also a set of national health standards for major development projects such as wastewater treatment plants have been notified to all executive bodies. In this regard, this project reviews the impact of construction of the above treatment plants on health of the personnel and residents of the project, review of treated wastewater utilization method and the method of sludge disposal in the treatment plants.

The treatment process in all plants is based on A2O with anaerobic digestion of sludge. The project specifications are as follows:

• Parand treatment plant includes four modules and eight flow lines, the liquid effluent part of the module 1 is under operation, the second module is in progress and the other two modules have not been constructed.

• Robat Karim treatment plant comprises two modules and four flow lines, module one is under construction and the other one has not been constructed yet.

• Eslamshahr treatment plant is composed of three modules and six flow lines, module one (a half module is under construction and a half module is under operation), and the other two modules have been constructed yet.

• Baharestan treatment plant is composed of three modules and six flow lines where none of modules has been constructed yet.

STAGE: First Phase

LOCATION: Tehran city

MOSHANIR’S ROLE: Project consultant

SPECIAL ACHIEVEMENTS: - Identification of the health status of the region - Identification of the most contagious and non-contagious diseases in the region - Identification of the most important diseases attributable to the project - Development of control measures plan and monitoring plan for the most important impacts of the project

Health Impact Assessment of 500 MW Gachsaran Power Plant

PERIOD: 2017-2019

EMPLOYER: Thermal Power Plants Holding Company

TECHNICAL SPECIFICATIONS: - Review of the potential health effects caused by the operation of the power plant, emission of pollutants and the impact on health of the personnel and residents of the project area and also identification and assessment of health risks associated with the project.

STAGE: Completed

LOCATION: Gachsaran County

MOSHANIR’S ROLE: Project consultant

SPECIAL ACHIEVEMENTS: - Identification of the health status of the region - Identification of the most important contagious and non-contagious diseases in the region - Identification of the most important diseases attributable to the project - Prediction of increased mortality rate of pollutants produced by power plant. - Development of control measures plan and monitoring plan for the most important impacts of the project.

Health Impact Assessment of 480 MW Shahid Salimi Power Plant, Neka

PERIOD: 2019-2020

EMPLOYER: Thermal Power Plants Holding Company

TECHNICAL SPECIFICATIONS: -- Review of the potential health effects caused by the operation of the E-class combined cycle power plant consisting of two ۳۲۴-MW gas turbines and one ۱۶۰-MW steam turbine, Identification of emission pollutants and the impact on health of the personnel and residents of the project area, identification and assessment of health risks associated with the project.

STAGE: First Phase

LOCATION: Neka County

MOSHANIR’S ROLE: Project consultant

SPECIAL ACHIEVEMENTS: - Identification of the health status of the region - Identification of the most important contagious and non-contagious diseases in the region - Identification of the most important diseases attributable to the project - Prediction of increased mortality rate of pollutants produced by power plant. - Development of control measures plan and monitoring plan for the most important impacts of the project.

Health Impact Assessment of 906 MW Ramin Power Plant, Ahvaz

PERIOD: 2017-2018

EMPLOYER: Thermal Power Plants Holding Company

TECHNICAL SPECIFICATIONS: - Review of the potential health effects caused by the operation of the power plant, emission of pollutants and the impact on health of the personnel and residents of the project area and also identification and assessment of health risks associated with the project.

STAGE: Completed

LOCATION: Bavi County, suburb of Ahvaz City

MOSHANIR’S ROLE: Project consultant

SPECIAL ACHIEVEMENTS: - Identification of the health status of the region - Identification of the most important contagious and non-contagious diseases in the region - Identification of the most important diseases attributable to the project - Prediction of increased mortality rate of pollutants produced by power plant. - Development of control measures plan and monitoring plan for the most important impacts of the project.

Passive Defense

IMMUNIZATION AND CONTROL OF GAS NETWORK IN THE GREATER TEHRAN

PERIOD: 2007 – 2014

EMPLOYER: Tehran Province Gas Company

TECHNICAL SPECIFICATIONS: Seismic retrofitting of central control building, and mechanical equipment and buildings of gas pressure reducing stations, installation of SCADA and control systems of gas pressure reducing stations and gas shutoff equipment

LOCATION: Tehran city

STAGE: Basic and detailed designs are completed, and retrofitting of some stations has been done

MOSHANIR’S ROLE: Engineering phase including basic and detailed design, preparation of technical specifications of tender documents for the above parts and supervision on construction

SPECIAL ACHIEVEMENTS: In this project, buildings and mechanical equipment of Tehran gas reducing stations are seismically retrofitted. Local and remote monitoring systems protect gas stations and network against earthquake through gas shutoff. In this project, a seismically retrofitted central control building will be constructed for remote monitoring and control of the stations as well as for control of Tehran gas network in critical and normal situations.

VIBRATION MONITORING IN 63 kV SUBSTATION ENVIRONMENT OF DOROUD CEMENT COMPANY

PERIOD: May – November, 2008

EMPLOYER: Bakhtar Regional Electric Company

TECHNICAL SPECIFICAITONS: Commissioning of 63 kV substation of Doroud Cement Company after construction was not possible due to environmental vibrations of the company’s vibrating machines. Moshanir, in form of a project for Bakhtar Regional Power Company, provided some appropriate solutions to reduce the vibrations in order to enable the Employer to operate the said substation.

LOCATION: Doroud cement company

STAGE: Completed

MOSHANIR’S ROLE: Identification of the existing conditions through collection of technical documents regarding vibration producing devices, soil mechanical and dynamic properties of the area, dynamic characteristics of the considered equipment and their foundations, control building drawings, and other necessary documents, as well as performance of tests to measure and assess the amount and characteristics of the vibrations transmitted to the substation, equipment modeling and performance of required analyses to investigate the impacts of vibrations on the considered equipment.

PREPARATION OF SEISMIC DESIGN MANUAL FOR POWER TRANSMISSION SUBSTATIONS

PERIOD: 2009 – 2011

EMPLOYER: Tavanir Company

TECHNICAL SPECIFICATIONS: Subject of this project is “preparation and formulation of guidelines for design of main equipment and buildings for power transmission substation against earthquake loads” in order to be used by consultants and those involved in power industry of the country.

LOCATION: -

STAGE: Completed

MOSHANIR’S ROLE: Review of previously performed studies and guidelines, review of similar modern guidelines and standards of the world, comparative study of the above guidelines and Iranian Earthquake Code (2800), determination of the criteria and standards associated with each of the structural, electrical, and mechanical sections as specified in the said code, preparation of substation visit checklists regarding seismic issues, formulation of a special guideline to perform geotechnical studies and geological surveys through definition of criteria and factors in the design of this part, preparation of guidelines for earthquake risk analysis for each substation in order to achieve the seismic parameters of the area and the criteria to be enforced.